background image

6

ACR 

air curtains 

Operation and Maintenance Documentation

5.

    INSTALLATION

When deciding on the air curtain position you should take into account such factors as:

• 

  Ease of access for servicing,

• 

  Access to water and electricity supplies

It is recommended to install the air curtain in position above the entrance opening, on the wall or under the ceiling, on support pins

or horizontal mounting brackets. It is also possible to mount it vertically to a wall or other structure using vertical mounting brackets.

It’s important to make sure that the unit is properly levelled. In case of positioning in a different way than horizontal or vertical, during

installation, damage to the fan may occur and in consequence malfunction of the unit.

Inlets and outlets cannot be blocked by any objects. When installing the curtains, keep in mind that you will have free access to the

control panel. With larger door openings, it is possible to mount more curtains of the same type, one by one, to create an

uninterrupted air flow. The curtain is permanently mounted in either a horizontal or vertical position (on the left/right side of the

entrance).

Curtain connection should be done in a serviceable manner, manual shut-off valves should be installed on both nozzles to enable

disconnection. In case of a solenoid valve (option - automatics), it must be connected at the water outlet of the device, otherwise it

may be damaged. When tightening the pipeline to the exchanger, the heater connection must be protected against torque (which

may cause leakage in the exchanger).

Horizontal installation under the ceiling using mounting pins

Installation under the ceiling is done by using 4 M8 pins. In order to hang the device on the pins, drill holes Ø 8-9mm in the EPP

housing directly in front of the existing holes in the steel inlet grille. The exact location is indicated by special tags on the EPP

housing. The pins should be screwed into the nippers at a depth of 10-14mm.

Содержание ACR 1000W

Страница 1: ...EN Operation and Maintenance Documentation www pakole com ACR_008_039_011_221021_V004_en Type ACR 1000W ACR 1000E ACR 1000C ACR 1500W ACR 1500E ACR 1500C ACR 2000W ACR 2000E ACR 2000C AIR CURTAINS...

Страница 2: ...CE 3 3 BASIC TECHNICAL PARAMETERS 4 4 HEAT OUTPUT RANGES 4 5 Installation 6 6 CONTROL PANEL 10 7 ACR DOOR SWITCH 10 8 DIAGRAMS OF ELECTRICAL CONNECTIONS 11 9 DIMENSIONS OF THE ACR 1000 1500 2000 W E C...

Страница 3: ...reduce the airflow in order to ensure the fire safety and if sparks or a damaged supply cable noticed discontinue the operation immediately Electricity network to which the curtain is connected shoul...

Страница 4: ...r W 37 80 160 51 106 220 75 162 320 Electric heater consumption V Hz A Weight with water without water kg 15 18 5 25 Sound level dB A 45 50 60 46 50 61 47 50 61 Protection Class IP IP21 IP21 IP21 ACR...

Страница 5: ...3 24 5 27 7 30 9 22 1 25 3 28 5 31 6 34 8 26 1 29 2 32 4 35 6 38 7 30 0 33 1 36 3 39 5 42 6 Water flow m3 h 0 4 0 3 0 2 0 2 0 1 0 5 0 4 0 4 0 3 0 3 0 6 0 6 0 5 0 4 0 4 0 8 0 7 0 6 0 6 0 5 0 9 0 8 0 8...

Страница 6: ...ol panel With larger door openings it is possible to mount more curtains of the same type one by one to create an uninterrupted air flow The curtain is permanently mounted in either a horizontal or ve...

Страница 7: ...the wall in a horizontal position using 2 mounting brackets to the horizontal system In the brackets there are 9mm holes for M8 screws In the EPP housing drill holes 12 13mm in front of existing hole...

Страница 8: ...g drill holes 12 13mm in front of existing holes in the steel in take grille The exact location is indicated by special tags on the EPP housing and the figure below Then insert the spacer sleeves into...

Страница 9: ...er use a vent which is located on the exchanger collector on the engine side ATTENTION It is necessary to ensure that the unit is properly leveled When it is mounted in a position other than vertical...

Страница 10: ...L not supported function in this settings the device does not work To install the control panel unscrew the screw remove the front cover and panel board fix the panel to the wall and replace the panel...

Страница 11: ...g The set does not include power cord or main switch Diagram of connecting one ACR 1000 1500 2000 W water heater and C without heater to the COMFORT panel Power supply 230V 50Hz Security system B4 Cro...

Страница 12: ...B25 Control Panel COMFORT 3 speed fan control with thermostat OMY 5x 1 0mm In the MASTER curtain between the L1 NC terminal replace the factory made fuse C 3 15 with C 6 3 400V 50Hz power supply wire...

Страница 13: ...control circuit between terminal 3 on Comfort Panel and Terminal 2 in the ACR curtain The on off switch itself should be installed in a place suitable for the curtain user Warning The Comfort Panel t...

Страница 14: ...vated PP OPERATION Digital signal 1 potential free contact closed information about the operation of the curtain reed relay on door opened Digital signal 0 potential free contact opened Reed relay off...

Страница 15: ...n the COMFORT panel in ON position READY FOR OPERATION 1 signal activated PP OPERATION Digital signal 1 potential free contact closed information about the operation of the curtain reed relay on door...

Страница 16: ...16 ACR air curtains Operation and Maintenance Documentation 9 DIMENSIONS OF THE ACR 1000 1500 2000 W E C CURTAINS...

Страница 17: ...f and the heat input disconnected Only suitably qualified staff well acquainted with the safety regulations concerning handling with an electrical device must be employed when the device is being inst...

Страница 18: ...n suitable part and mending which is done by not authorized retailer or service station The regular maintenance is the owner s responsibility The manufacturer does not assume the responsibility in cas...

Страница 19: ......

Страница 20: ...PAKOLE TRADE Kft H 8000 Sz kesfeh rv r B rg ndi t 8 10 www pakole com mail pakole hu Tel 36 22 316 484 www pakole com...

Отзывы: