9
ACR
air curtains
Operation and Maintenance Documentation
It is important to note that the minimum distance between the unit and the floor for installation with engine at the bottom is not less than
100mm. This allows access to the electrical terminal strip and to the water exchanger vent.
The connection of the heating medium to the heat curtain, using G 1/2” threaded connections, should be made on the basis of a design
by an authorized designer. If the air curtain is connected to a district heating network without a mixing unit, a water filter is required.
In case of horizontal and vertical mounting with nozzles at the top, the exchanger is vented through the nozzles. If the device is mount-
ed vertically with nozzles at the bottom, to vent the exchanger, use a vent which is located on the exchanger collector on the engine
side.
ATTENTION !
It is necessary to ensure that the unit is properly leveled. When it
is mounted in a position other than vertical or horizontal there is
a risk of fan damage and unit malfunction
To connect the power supply, control and / or bleed the Exchange move out the right lid, which is fastened with the lock to the lower
steel housing and the main housing EPP. The lid is disassembled in the direction shown by the arrows in the figure below. The lid
should be grasped in the following places indicated in the drawing and should be gradually “released” from the locks for several milli
-
metres. Cable entries for power and control cables are located on the inlet grille.
Connection of heating medium
Connecting the power supply and control system of the curtain
ATTENTION !
Ensure that no connection wire is clamped between the lid and
the rest of the curtains before assembling the lid.
Содержание ACR 1000W
Страница 19: ......