Packet Power
Multi-Circuit Monitor BGS16 User Manual V2.0
© 2021 Packet Power, LLC
Page 10 of 27
SECTION 3: INSTALLATION
IMPORTANT
1.
Installation should be conducted by a qualified professional according to local
electrical codes.
2.
Protective equipment should be used when handling a current transducer (CT) on a
live conductor.
3.
Do not make adjustments to the BGS16’s internal wiring.
4.
If you believe the BGS16, CTs, interconnect boards or leads have been damaged, do
not attempt to repair or use them. All components are built to spec by Packet Power
and are not intended for alteration in the field.
Please review the complete list of safety instructions in the Hazards sections of this
document.
Installation Overview
The BGS16 does not need to be configured prior to use.
1.
Mount the BGS16 to wall or device using mounting tabs provided.
2.
Run the voltage lead(s) to the voltage source and connect them to L1, L2, L3, N and
earth.
3.
Mount the CT Interconnect Board near the circuits being monitored.
4.
Attach the connector at the end of the CT Interconnect Cable to the CT Interconnect
Board header.
5.
Run CT leads from the CT Interconnect Board to the respective circuits.
6.
Connect each CT to the appropriate conductor.
7.
Connect CT tails to the CT leads.
Once power is supplied, the BGS16 will automatically begin to transmit data.
Thoroughly review the details for each step prior to installation. Contact Packet Power
support with questions.
Mounting
The BGS16 should be mounted as close as possible to the equipment being monitored.
Mounting locations
Use the mounting tabs provided for wall mount or the chase nipple provided to install
directly onto equipment.