![Pacific energy Trenton Скачать руководство пользователя страница 30](http://html2.mh-extra.com/html/pacific-energy/trenton/trenton_installation-and-operating-instructions-manual_3175751030.webp)
30
100000457 180118-40
TRNT.BODYA
Installer information
The bottom edge of the screen mesh must
fi t fi rmly into the channel provided for it
in the fi re box frame. Figure 59 shows the
location of the screen mesh channel.
Fire box
side
Do o r
side
The screen mesh top holder (Figure 60)
positions the screen mesh so that there is
the correct distance between the screen
mesh and the glass door. The holder has
channels which will secure the top of the
screen mesh once the holder is lowered
into position.
Screen
me sh
Screen
me sh
Figure 61 shows the screen mesh holder in
place with the holder channel keeping the
screen mesh in its proper position.
Note: it may be necessary to use a small
amount of force to get the top of the
screen mesh to fi t into position of the
screen mesh holder.
Return the top cover to its proper place.
Make sure that the latticed oval panel in
the center of the top-cover does not slip
off as it is not fastened to the larger panel.
Figure 59: Screen mesh location channel.
Figure 60: Screen mesh holder.
Figure 61: Screen holder in correct position.