8
©PACIFIC ENERGY FIREPLACE
PRODUCTS LTD.
28 5/8"
728
40"
1016
41 3/8"
1051
21 7/8"
554
24"
610
24 7/8"
633
6 1/8"
157
NEO 2.5 Dimensions
Crate Removal
1) Carefully remove wood top and supports.
2) Remove plastic cover.
3) Using a 7/16"(12mm) wrench, remove lag bolts that secure
hold down brackets to bottom pallet.
4) Slide the hold down brackets away from the stove.
Soapstone
FIG. #1
NOTE: DIMENSION
DOES NOT INCLUDE
LEVELLING LEGS
NOTE: ALL DIMENSIONS
IN INCHES[MM]
Removal and Installation:
NOTE: It is recommended that two people remove or install
the Soapstone Top and Side Panels due to the high weight of
the pieces. Soapstone can be easily scratched and damaged.
Please be very careful when removing or installing the Top and
Side Panel pieces and place pieces on a non-marring surface.
1) Lift the Top piece up off the pins at the front corners of
the Top and from around the flue collar as shown in Fig.
#2.
FIG. #2
PINS