1. Feed the AC power supply cable(s) into the EVSE.
2. Allow for sufficient over length for future repair of the connections
3. Make sure, sufficient length is available for 3x a repair session.
4. Install the cable lug and the shrink sleeve to the cable in accordance with
the manufacturer's instructions.
1. Flat washer
2. Conical spring washer (Belleville)
3. Bolt, M10
4. Cable lug
5. Shrink sleeve
6. Cable
7. Busbar
8. Flat washer
9. Nut
Connect the AC power supply cables
Connect the Output Connections
5.3
5.4
Caution:
Be careful when you install the conical spring washer. The hollow side must face the
busbar. Incorrect installed conical spring washers are not short-circuit proof.
Incorrect installation will cause (serious) damage to the equipment.
When an external EV coupler is used, the responsible parties must reference the detailed
information provided in the documentation that comes with the EV-coupler.
•
The items in sections preceding this still apply in order to install the base unit.
•
An additional set of outputs is needed to be installed to connect the base unit to the external
coupler or couplers.
•
The DC cable shall be routed in its own duct.
•
The PE and CP (optional signal) cable shall be routed in their own duct with the control wires
and Ethernet.
•
The 400VAC supply shall be routed in its own duct
•
The DC and CP ducts shall be at least 500 mm away from each-other, or routed in EMC
shielding raceways such as rigid conduit.
The DC+ and DC- cables of the external DC outlet must be connected onto the interface panel
inside the base module to the DC+ and DC- connections. The other connections must be made
onto the terminal strip in output groups from left to right (X501, X502, or X503) as called for in a
site-specific system layout.
Earth cable must be connected to rail A-PE1.1.
Note:
The EVSE unit described in this manual may support several different output
configurations. Please refer to the site system layout documentation along with the
EV-coupler documentation for detail on all connections needed at a site.
18