End  of  normal  charge: 

when  the  above-mentioned  time  has  elapsed,  the 

green  L3  LED

,  indicating 

“BATTERY OK”, lights up. 
Then an equalizing charge, if enabled (

CEQ jumper)

, takes place. 

 

Pause

:  60min-long  charge  interruption  which  separates  the  end  of  normal  charge  and  the  beginning  of  the 

equalizing charge. 

 

Equalizing charge:

   

After  the  normal charge a pause will take place (

T.Pause = 60 min

) after which Equalizing will be performed 

(for a 

Teq time = 45h

).

 

Equalizing  is  made  up  of  a  certain  amount  (

Np=3

)  of  pulse  (

Neq=5

)  packages,  each  of  which  consists  of 

charges (T.ON=12min) and pauses (T. OFF=48min). 

The above mentioned pulse packages alternate with pauses (

Ts = 15h).

 

These pulses are performed during the 

Active cycle (=45h)

, followed by a 

Stop cycle (=120h)

This equalizing system has no time limits and stops on battery disconnection. 
The  system  is  very  useful  during  holidays  and  week-ends,  since  it  makes  it  possible  to  keep  battery  charged 
while preventing overcharging, overheating, and/or water consumption. 

FLOATING CHARGE 

At the end of a complete equalized charge cycle ( 45 hours ) if the battery remains connected (during holidays 
for instance ) the equalization cycles are repeated every 120 hours (5 day )  
This  cycle  of  charge,  that  compensates  the  battery  self–discharge  , 

is  repeated  until  the  user  remove  the 

battery. 

 

Warning 

:  

 

Before  disconnecting  the  battery,  check whether the charging process has been completed. If the 
charging process is still being performed and needs being interrupted, press the ON-OFF button.

 

 

Never disconnect the battery connector before interrupting the charging process !

 

 
The charging process can be interrupted without disconnecting battery by pressing the ON-OFF button; in this 
way charging times are stored and by pressing the ON button again, the charging process is resumed from the 
point of interruption. 
 
If battery is disconnected during a pause of the equalizing charge or after entering the OFF status by pressing 
the  relevant  push-button,  the  battery  charger  will  reset  and  it  will  begin  a  new  charge  on  connecting  the  new 
battery. 
 

Содержание SE

Страница 1: ...I VIGNOLA MO ITALIA Tel 39 059 7705311 Fax 39 059 7705300 http www gruppopbm it e mail pbm gruppopbm it file Manuale SE PBM753 GB rev 1 doc TECHNICAL MANUAL FOR SE BATTERY CHARGER with PBM753 electro...

Страница 2: ...TAGE AND CHARGING STAGES 4 4 1 CARD SETTING ON BATTERY CHARGER WITHOUT BATTERY 5 CHAPTER 5 BATTERY CHARGER FUNCTIONS 5 CHAPTER 6 DESCRIPTION OF THE CHARGE 6 FLOATING CHARGE 7 7 1 BATTERY DISCONNECTION...

Страница 3: ...y charger operating range with rated voltage from 24V to 96V Card powered by mains only 24Vac ON OFF relay 24VAC 10A with contacts on connector Battery charger functions configuration jumpers set by t...

Страница 4: ...ours the automatic start of the charger is enabled 3 hours after connection to power CPR Proportional charge CI11h Safety timer set at 11 hours instead of 9 which is the default setting CF4h 4h long f...

Страница 5: ...the gassing voltage which may range between 2 3 and 2 5V cell By turning the one turn VGAS trimmer it is possible to set the gassing voltage with a very high accuracy as described in Chapter 4 1 The P...

Страница 6: ...has permanently switched to the final charge stage the LED light will not go off any more even if the battery voltage falls below 2 40V cell In this case reset the mains and make the procedure again C...

Страница 7: ...d CHAPTER 6 DESCRIPTION OF THE CHARGE Once all connections mains and battery have been performed the electronic card PBM 753 makes a lighting test of all the leds After this test just the L1 green led...

Страница 8: ...on The system is very useful during holidays and week ends since it makes it possible to keep battery charged while preventing overcharging overheating and or water consumption FLOATING CHARGE At the...

Страница 9: ...perates during the initial charge the battery charger stops the charging process and signals it by means of the red L4 LED which lights up constant To exit from all fault conditions the battery charge...

Страница 10: ...ns voltage which is too high or too low compared with the rated value may result in big differences in the current delivered by the battery charger with following malfunction of the charger and lower...

Страница 11: ...se F1 on the PBM753 card 3 Check the path of the charging cables making sure that there are neither bad contacts on plugs nor overheatings on parts of cables or cable terminals 5 Check the voltage pat...

Страница 12: ...ES REMEDIES AND OR CHECKS TO BE PERFORMED THE CHARGER DELIVERS TOO MUCH CURRENT Mains very high Adjustments not correct Battery too low Wrong wiring of the Main Transformer 1 Make sure that the charge...

Страница 13: ...ion characteristics suitable for the specific load K and D curves BURNT FUSE ON CARD Defective card or wrong power supply of the card 1 Make sure that the voltage battery is correct see Jumper J10 pos...

Страница 14: ...n aluminium sheets which act as dissipaters To achieve different current capacities the bridge is made up of a variable number of diodes positioned in parallel on the same plate To test operation of t...

Страница 15: ...anuale SE PBM753 GB rev 1 doc page 14 2 Make sure that there is an infinite diode by pointing the positive test prod on positive pole of bridge output and negative test prod on each phases input 3 Mak...

Страница 16: ...e Manuale SE PBM753 GB rev 1 doc page 15 4 Make sure that there is an infinite diode voltage by pointing the positive test prod on the phases and negative test prod on the negative output of bridge In...

Страница 17: ...130 150V CHAPTER 11 MAINTENANCE AND CLEANING All maintenance and cleaning processes have to be performed by qualified skilled and authorised personnel Since the battery charger is an electrical equip...

Страница 18: ...400 420 440V 0 24V TR Three phase transformer TA series RD Diode rectifier bridge PTSxxx E SH1 Shunt 100A 100mV or 200A 100mV P1 ON OFF green button PBM753 Electronic control card with microprocessor...

Страница 19: ...sion no 1 dd 01 02 2017 P B M S r l via Barella Z I VIGNOLA MO ITALIA Tel 39 059 7705311 Fax 39 059 7705300 http www gruppopbm ite mail pbm gruppopbm it file Manuale SE PBM753 GB rev 1 doc page 18 WIR...

Страница 20: ...ion no 1 dd 01 02 2017 P B M S r l via Barella Z I VIGNOLA MO ITALIA Tel 39 059 7705311 Fax 39 059 7705300 http www gruppopbm ite mail pbm gruppopbm it file Manuale SE PBM753 GB rev 1 doc page 19 WIRI...

Отзывы: