![Oxford Instruments PlasmalabSystem100 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/oxford-instruments/plasmalabsystem100/plasmalabsystem100_installation-data_1664944005.webp)
Installation Data
Oxford Instruments Plasma Technology
Plasmalab
System100
Installation Data (PECVD - TEOS)
Printed: 10-Feb-11, 9:07
Page 5 of 24
Issue 10: February 11
1412
1630
747
550
SERVICE ACCESS
OIPT RECOMMENDS THAT AT LEAST 600mm
SERVICE ACCESS SPACE IS ALLOWED BETWEEN
ANY OBSTACLE (E.G. WALLS, PARTITIONS, ETC.)
AND SERVICEABLE ITEMS, E.G. THE POWER
DISTRIBUTION UNIT.
Fig 1: PECVD system layout (3-frame Base pressure turbo configuraton)
NOTE: For services panel details, see
Fig 4.