Installation and operating instructions
“Aquastrom VT”
11
Item no. DN L
1
L
2
H
1
H
2
H
3
H
4
D
4206704 15 110 188 95 98 103 145 G
3
⁄
4
4206706 20 123 188 95 98 103 145 G 1
L
1
L
2
D
H
1
H
2
H
3
H
4
Item no. DN L
1
L
2
H
1
H
2
H
3
H
4
D
4205704 15 110 188 95 98 103 145 Rp
1
⁄
2
4205706 20 123 188 95 98 103 145 Rp
3
⁄
4
L
1
L
2
D
H
1
H
2
H
3
H
4
Recommeded control range: 55 °C up to 60 °C.
Control accuracy: ±1°C
Installation position: any, but easily
accessible
Max. ambient temperature: 90 °C
Operating temperature: 0 up to 90 °C
Operating pressure: 10 bar
Max. test pressure: 16 bar
Note:
It is recommended to actuate ball valves at
least once or twice a year.
6. Assembly
6.1 Extent of supply
The valve is supplied with installation and
operating instructions and is packed in
Styrofoam insulation shells with fixing clamps.
The insulation shells also serve as protection
during transport. Check delivery for any
damages
caused
during
transit
and
completeness.
6.2 Installation location and position
The valve can be installed in any position
(horizontal, oblique or vertical) and should be
easily accessible. If a riser has to be isolated or
drained off, it makes maintenance work and
viewing of the thermometer display easier.
The valve should preferably be installed at dry
locations.
When installing the valve, please make
sure that there is enough space fort he
insulation shells!
6.3 Pipe connection
The valves have a Rp
1
⁄
2
or Rp
3
⁄
4
female thread
according to DIN10226-1 or a G
3
⁄
4
or G1 male
thread according to DIN ISO 228.
Flat sealing connection options:
Press, solder, weldable or threaded tailpipes
(item no. 42005, 13, 14, 20. see accessories)
5.1 Dimensions
���
Item no. DN
쏗
D L
1
L
2
H
1
H
2
H
3
H
4
4205752 15 15 115 188 95 98 103 145
4205753 15 18 115 188 95 98 103 145
4205754 20 22 130 188 95 98 103 145
L
1
L
2
쏗
D
H
1
H
2
H
3
H
4
Содержание 4205704
Страница 39: ...39 Notizen ...