![Oval Smart EX DELTA II Series Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/oval/smart-ex-delta-ii-series/smart-ex-delta-ii-series_instructions-manual_1662166016.webp)
D-582-3-E
Fig. .8
Fig. .
Preamp Fitting
Screw
Adaptor
Preamplifier
Flange Connecting
Bolt
Pipeline Lagging
Simple Lagging Work
(
Split-design desirable
for ease of maintenance
)
Lagging Work
Preamplifier
Cable Entry
To Probe
Display
Removal Procedure
() Disconnect wiring of the preamplifier.
(2) By turning the handwheel, retract the probe.
Retract it until the guide arrives at match mark "B" on the stud.
(3) Confirming that the probe has been retracted completely, fully shut off the gate valve.
() Taking precautions against internal pressure, carefully open the vent valve, allowing the internal
pressure to escape.
(5) Remove the flowmeter from above the gate valve.
6.4.3 Preamplifier Orientation
As viewed from the direction of flow (upstream
side), the preamplifier typically installs inclined to
the left. The cable entrance points downward. In
the standard installation, the display of a display
equipped preamplifier (PA25S) faces in the
direction of outflow (downstream side).
6.5 Lagging Work
If heat insulation is considered for the piping,
simplified lagging (without mortar finish) is
suggested for the area where the meter is
installed to facilitate disassembly and inspection.
Such consideration will simplify meter connecting
bolt removal without the need of breaking the coat
of lagging material at servicing.
Содержание Smart EX DELTA II Series
Страница 53: ...D 582 3 E 53 ...