15.
Starting at Rear Corner, position a Wall Panel on
top of plywood floor. Depending on your preference, you
may use a solid or window wall panel in this position. If
using a solid wall, make sure panel is facing up.
Important:
Make sure all walls are aligned in their upright
position. If not ,water may leak into your playhouse.
Unsure if panel is facing up or down? check siding
on window wall panel to match alignment.
16.
The side wall panels will sit flush at the end of the plywood floor with the front and rear panels
sandwiching between them.
Note:
Siding will overhang the floor by approx. 1/2”
Outside 2x3 Plate of wall panel is flush with
outside of plywood when properly aligned.
Side Wall Panel
14.
Locate
Window Inserts
. Place Window Insert into wall opening tight to wall siding. On the
inside, shim Window Insert evenly in cavity. Kits include one additional shingle for shimming of the
window. When properly positioned, secure Window Insert to wall framing cavity with 4 - 2” screws.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 8
Wall Plate
13.
Starting with All
Solid Wall Panels
, carefully lay panel face down. Position and attach
Bottom
Wall Plates
to bottom of wall studs of each wall panel with 3 - 2 1/2” screws. Position so Wall Plates
are flush with framing.
Note,
You may prefer to
install Windows in
the Miscellaneous
Section at the end
of assembly.