7.
Attach
Floor Runners
to completed floor
frame. There are 2 floor runners per 136 1/2” side
and 5 completed runners in total. Use 6 - 2.5”
screws per Runner.
96”
5.
Complete all large and small frame attachments. Screw
each completed section together with 8 - 2.5” screws.
6.
When completed, your floor footprint
should be 136 1/2” Deep x 96” Wide.
136 1/2”
8.
Make sure Runners are flush with outside and
front and rear floor framing but not overhanging.
3.
Lay out
Floor Joist Frames
as
illustrated at left. There are 3 larger and
3 smaller Frame Sections. The Footprint
for the floor when attached together will
be 136 1/2” Deep x 96” Wide.
4.
Attach each large and small floor joist frames
together with 6 - 2.5” screws per section.
Front
of
Shed
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 5
Material used for Floor
Runners are not graded
for appearance. Some
defect is allowed.