B_PM_UMCbox_en05.doc
5-8
Maintenance
ÖSTLING Markiersysteme GmbH
Slides of the axes
(see page 5-4)
Every 40 operating hours.
1. Switch off the control.
2. Move the slides manually in X- and Y-direction.
Slides must be movable easily by hand.
3. If the slides can be moved only with difficulty: lubricate the guiding rods of
the axes:
1
Rear guiding rod of the X-axis
2
Front guiding rod of the X-axis
3
Left guiding rod of the Y-axis
4
Right guiding rod Y-axis
Marking head without covering cap
Fig. 10191
Check on
smooth running
Содержание PinMark UMC box
Страница 14: ...B_PM_UMCbox_en01 doc 1 8 Safety ÖSTLING Markiersysteme GmbH ...
Страница 32: ...B_PM_UMCbox_en03 doc 3 12 Description ÖSTLING Markiersysteme GmbH ...
Страница 91: ...B_PM_UMCbox_en07 doc ÖSTLING Markiersysteme GmbH Index 7 1 Chapter 7 Index ...
Страница 94: ...B_PM_UMCbox_en07 doc 7 4 Index ÖSTLING Markiersysteme GmbH ...
Страница 95: ...B_PM_UMCbox_en08 doc ÖSTLING Markiersysteme GmbH Drawings parts lists 8 1 Chapter 8 Drawings parts lists ...
Страница 96: ...B_PM_UMCbox_en08 doc 8 2 Drawings parts lists ÖSTLING Markiersysteme GmbH ...
Страница 98: ...B_PM_UMCbox_en09 doc 9 2 EC declaration of conformity ÖSTLING Markiersysteme GmbH ...
Страница 100: ......
Страница 101: ...B_PM_UMCbox_en10 doc ÖSTLING Markiersysteme GmbH Service request 10 1 Chapter 10 Service request ...
Страница 102: ...B_PM_UMCbox_en10 doc 10 2 Service request ÖSTLING Markiersysteme GmbH ...
Страница 104: ......