B_PM_UMCbox_en02.doc
2-4
Set-up
ÖSTLING Markiersysteme GmbH
1.2 Built-in units
Horizontal (on the left) and vertical installation of the marking head
Fig. 10262
All marking heads are supplied ready for use. The following points must be con-
sidered when installing the marking head into a production line:
•
Built-in units must be installed adjustable to allow subsequent aligning
and/or exact adjusting of the distance tool tip - workpiece.
•
Use a bellows (option) as cover if the unit is operated in a heavily soiled
working environment. This cover can be used only with horizontal instal-
lation of the unit.
Marking head 5 / 9 with coining tool WE2 and bellows (option)
Fig. 10276
Содержание PinMark UMC box
Страница 14: ...B_PM_UMCbox_en01 doc 1 8 Safety ÖSTLING Markiersysteme GmbH ...
Страница 32: ...B_PM_UMCbox_en03 doc 3 12 Description ÖSTLING Markiersysteme GmbH ...
Страница 91: ...B_PM_UMCbox_en07 doc ÖSTLING Markiersysteme GmbH Index 7 1 Chapter 7 Index ...
Страница 94: ...B_PM_UMCbox_en07 doc 7 4 Index ÖSTLING Markiersysteme GmbH ...
Страница 95: ...B_PM_UMCbox_en08 doc ÖSTLING Markiersysteme GmbH Drawings parts lists 8 1 Chapter 8 Drawings parts lists ...
Страница 96: ...B_PM_UMCbox_en08 doc 8 2 Drawings parts lists ÖSTLING Markiersysteme GmbH ...
Страница 98: ...B_PM_UMCbox_en09 doc 9 2 EC declaration of conformity ÖSTLING Markiersysteme GmbH ...
Страница 100: ......
Страница 101: ...B_PM_UMCbox_en10 doc ÖSTLING Markiersysteme GmbH Service request 10 1 Chapter 10 Service request ...
Страница 102: ...B_PM_UMCbox_en10 doc 10 2 Service request ÖSTLING Markiersysteme GmbH ...
Страница 104: ......