- 4 -
Filling up
1. Open a hot tap.
2. Open the cold water supply valve
3. when water flows from hot tap, close the tap
4. Allow the system to stabilize for 5 minutes
5. Open each hot water tap in turn to expel air from the system pipe work.
7. Check for leaks.
8. Manually operate Temperature and Pressure Relief Valve (5) to ensure free water flow through
discharge pipe. (Turn knob to left.)
Draining/flushing
1. Turn off mains supply.
2. Connect hose pipe to drain cock at base of cylinder.
3. Open hot tap. Open drain valve and open temperature & pressure relief valve.
4. Allow to drain. Follow commissioning instructions (above) to refill.
Safety Cut-out
1. The safety cut-out operates if:
a. Wiring is incorrect.
b. The immersion heater thermostat or cylinder thermostat fails.
c. Thermostat is set too high.
2. Remember before resetting the safety cut-out or altering the thermostat setting, isolate electrical
supply to the unit prior to removal of the electrical box lid.
3. Reduce thermostat setting and press the reset button. After adjustments are completed, ensure
the lid to the electrical box is replaced correctly and the retaining screw is fitted.
4. If still out of operation, contact installer.
Cold or tepid water
discharge from tundish -
The tundish should be installed away from electrical devices.
1. Close cold water supply valve
2. Open a hot tap.
3. Repressurise the expansion vessel air charge to its set level.
4. Close hot tap
5. Open the cold water supply valve
Hot water
discharge from tundish
This indicates a malfunction of a thermal cut-out, operating thermostat or the combined temperature
and pressure relief valve. Turn off the electrical supply to the immersion heater and also isolate an
indirect unit from the boiler. Contact the installer or competent engineer.
COMMISSIONING
SAFETY AND MAINTENANCE
RECOMMISSIONING INSTRUCTIONS
TABLE 3
Product
Max. design
Operating pressure
Pressure drop
Temp. / pressure
Safety valve
Exp. vessel
code
pressure
CW feed & coil
primary heater
relief valve
Pressure / conn.
capacity
HP GEO 200
8 bar
cw in 3 bar, coil 2.5 bar
0,2 bar
90-95°C / 10 bar
8 bar / 15mm - 1/2”
19 l.
HP GEO 250
8 bar
cw in 3 bar, coil 2.5 bar
0,2 bar
90-95°C / 10 bar
8 bar / 15mm - 1/2”
19 l.
HP GEO 300
8 bar
cw in 3 bar, coil 2.5 bar
0,2 bar
90-95°C / 10 bar
8 bar / 15mm - 1/2”
19 l.
Содержание Ecoline Geo RI HP
Страница 8: ...8 Heat pump...
Страница 11: ...11 Is the heat pump working Is Thermostat wired as per layout for S plan installation...
Страница 13: ...13 C O L L E C T I V E M A R K TM...
Страница 15: ...15 C C...