Positioning the unit

The water heater should be fitted level on a hard surface with sufficient load strenght to take the 

full weight of the cylinder (see table 1 page 1). Adjustable feet are fitted to ensure the unit can be 

adjusted to a level position. There is no limitations regarding the fitting distance from walls etc., but 

it is strongly recommended to ensure easy access to all pipe fittings etc. There should be at least 80 

cm of free space in front of the water heater to ensure easy access for servicing and maintenance. 

Protection from frost

If the water heater is in danger of being exposed to frost while not operating under electric power, 

the unit must be drained to avoid damage. Make sure the electric power is turned off before draining,  

otherwise the heating elements can be damaged and the warranty is void. Draining instructions, see 

“Commissioning” on page 4. 

Cold water inlet control (Multibloc) See Page 2 Items 3 - 4

This combination consists of a pressure reducing valve with integral strainer, check valve and

expansion valve with stainless steel seat. The pressure settings are set and locked in the factory and

are shown on the top of each valve. For optimum performance the following installation instructions

should be complied with.

Installation

1.   Cold water supply to be 22mm nominal size.

2.   Flush supply pipework before connection to remove all flux and debris prior to fitting the inlet

  controls. Failure to do this may result in irreparable damage to the controls and will invalidate

  the warranty.

3.   The “MULTIBLOC” can be fitted in any orientation to suit the installation as long as it is fitted in

  the correct flow direction. Check the flow arrows on the side of the body.

4.   The expansion valve should be either horizontal or pointing downwards. If fitted upwards, debris 

  may be deposited on the seat and cause fouling of the seat when the valve operates. Check 

  direction of flow arrows.

5.   The black plastic plugs in the body are pressure gauge connections to enable pressure

  monitoring to be carried out, should the system develop a fault. It is recommended that these

  be accessible (the pressure reducing valve has two - only one need be accessible).

6.   Expansion relief drain pipework must be connected to a safe visible discharge point via a

  tundish and the pipework must have a continuous fall.

7.   The pressure reducing valve has two outlets, the second one is for a balanced cold water

  supply, to a shower or a bidet 

(over rim type only, ascending spray type requires type AA, 

  AB or AD air gap). (Major shower manufacturers advise fitting a mini expansion vessel in 

  the balanced cold supply to accommodate thermal expansion and prevent tightening of 

  shower controls).

  Using the balanced cold connection to feed bath taps can reduce the flow available to the

  unvented cylinder. If not required the balanced cold supply is blanked off.

  The Benchmark Log Book enclosed with the cylinder should be completed after commissioning

  of the system and handed to the customer for future use.

INSTALLATION AND SERVICING INSTRUCTIONS

TABLE 4

 

Product 

Actual 

Weight   Weight 

Heat-up (mins) 

Rating (kW) 

Heat loss 

Primary 

Hot Water

 

code 

capacity (l.) 

empty 

full 

coil 

coil 

kWh/24h 

flow rate 

Capacity

  HP GEO 200 

197 

50 

241 

20,8 

26,9 

1,9 

15 l/min. - 80°C 

179

  HP GEO 250 

245 

55 

292 

23 

29,7 

2,1 

15 l/min. - 80°C 

209

  HP GEO 300 

286 

65 

341 

27 

27,1 

2,3 

15 l/min. - 80°C 

237

Содержание Ecoline Geo RI HP

Страница 1: ...ource information is included in this manual to link the cylinder with the heat pump This cylinder is manufactured and approved in accordance with EN 12897 2006 This manual gives detailed advice for i...

Страница 2: ...2 9 Hot Water Outlet 3 4 BSPF 10 Flexible Hose 202108 11 Flexible Hose for Expansion Vessel Not supplied 12 Sensor Pocket 1 2 13 Elbow Drain Cock 250445 14 Cable Entry 15 Electrical Box 16 Tee Piece 2...

Страница 3: ...tundish should be installed away from electrical devices Primary flow return motorised valve heat pump 17 The heat pump primary flow and return connections should be made to the unit The motorised val...

Страница 4: ...pleted ensure the lid to the electrical box is replaced correctly and the retaining screw is fitted 4 If still out of operation contact installer Cold or tepid water discharge from tundish The tundish...

Страница 5: ...o suit the installation as long as it is fitted in the correct flow direction Check the flow arrows on the side of the body 4 The expansion valve should be either horizontal or pointing downwards If f...

Страница 6: ...tted length of 22mm pipework is 9m Each bend or elbow is equivalent to 0 8m of pipework All pipework must have continuous fall and discharge in a safe visible position If any doubt refer to Building R...

Страница 7: ...ch immersion heater has a working thermostat adjustable between 40 C 70 C A safety cut out is also incorporated within the thermostat and will operate at 85 C 3 C Should this happen press the reset bu...

Страница 8: ...8 Heat pump...

Страница 9: ...9 00071259 00071259 Direct units Indirect units Thermostat 80020 Right thermostat 80030 Left thermostat 80020 Immersion heater 71259 Immersion heater 71259 Electrical spare parts...

Страница 10: ...as operated 4 Programmer set to central heating or not switched on 5 Cylinder thermal cut out has operated 6 Motorised valve not operating correctly 1 Check Heat Pump operation If fault suspected cons...

Страница 11: ...11 Is the heat pump working Is Thermostat wired as per layout for S plan installation...

Страница 12: ...blocks of flats the number served should be limited to not more than 6 systems so that any installation discharging can be traced reasonably easily The single common discharge pipe should be at least...

Страница 13: ...13 C O L L E C T I V E M A R K TM...

Страница 14: ...3 The benchmark certificate is completed at the time of installation 4 The OSO cylinder is serviced and maintained every 12 months and is marked as such in the benchmark logbook provided with the cyl...

Страница 15: ...15 C C...

Страница 16: ...COMPANY NAME COMPANY NAME COMPANY NAME COMPANY NAME COMPANY NAME COMPANY NAME COMPANY NAME COMPANY NAME COMPANY NAME TEL No TEL No TEL No TEL No TEL No TEL No TEL No TEL No TEL No TEL No COMMENTS COM...

Отзывы: