background image

1

4

INSTALLER & COMMISSIONING ENGINEER DETAILS

INSTALLER DETAILS

COMPANY NAME

DATE

ADDRESS

INSTALLER NAME

TEL No.

REGISTERED OPERATIVE ID CARD No.

(IF APPLICABLE)

REGISTRATION DETAILS

COMMISSIONING ENGINEER (IF DIFFERENT)

NAME

DATE

ADDRESS

TEL No.

REGISTERED OPERATIVE ID CARD No.

(IF APPLICABLE)

REGISTRATION DETAILS

GUARANTEE - OSO UNVENTED HOTWATER CYLINDER

IT IS THE RESPONSIBILITY OF THE INSTALLER TO COMPLETE THIS LOGBOOK AND PASS IT 

ON TO THE CUSTOMER. FAILURE TO DO SO MAY INVALIDATE THE CYLINDER GUARANTEE

The OSO stainless steel inner vessel is guaranteed against material defect or manufacturing faults for a period of 25 years from the 

date of purchase. All other parts including, but not limited to factory fitted electrical elements (damage caused by lime scale excluded), 

expansion vessel, thermostats and valves are guaranteed against material defects or manufacturing faults for 2 years from the date 

of purchase. In the event of a replacement component being required OSO Hotwater will supply such part(s) free of charge and 

freight paid, on condition that the defective component is delivered, freight paid to OSO Hotwater within 2 weeks of written notice 

being given to OSO Hotwater of the defect. Such replacement parts shall be guaranteed under the terms of this guarantee to the 

unexpired period of the aforementioned 2 year period.

This warranty is conditional upon the OSO cylinder being installed in compliance with the OSO Installation & Maintenace Instructions, all 

current legislation, codes of practice and regulations governing the installation of unvented hot water cylinders in force at the date of instal-

lation and provided that: 

1.  The water quality shall be in accordance with European Council Directive 98/83 EC, or revised version at the date of installation,

and is not fed with water from a private supply.

Particular: 

Chloride content: 

Max. 250 mg/l

Sulphate content:   

Max. 250 mg/l

Combination Chloride/sulphate: 

Max. 300 mg/l (in total)

2.

The OSO cylinder is filled with water before turning the electr

i

city supply on to the heater elements.

3.

The log book certificate is completed at the time of installati

o

n.

4.

The OSO cylinder is serviced and maintained every 12 months and is marked as such in the logbook provided with the cylinder.

Invoices for the maintenance work should be kept as proof of regular maintenance. Care should be taken of the logbook and

invoices as they serve as the guarantee certificate for the cyl

i

nder.

5.

If the newly fitted water heater is not in regular use then it

 m

ust be flushed through with fresh water for at least 15 minutes

 

Open

at least one hot water tap once per week, during a period of at least 4 weeks.

6.

The OSO unvented cylinder has not been modified in any way othe

r

  than by OSO Hotwater and is only used for the storage of

potable water.

7.

No factory fitted parts have been removed for unauthorised repa

i

r or replacement.

8.

Defects caused by frost, excess pressure, salt dehardner process, transient voltage, lightning strikes or incorrect installation,

repair or use, are not covered by this warranty. A laboratory evaluation of possible defects can be ordered by the user,

 

however

the user must pay for this where the above mentioned conditions have not been fulfilled. Evidence of the purchas

e

 

date and the

date of supply must also be submitted with your claim.

This guarantee does not confer any rights other than those expressly set out above and does not cover any claims for consequential loss 

or damage. This guarantee is offered as an extra benefit and does not affect your statutory rights as a consumer.

Содержание DGC 200

Страница 1: ...in hot water cylinders in accordance with Building Regulation Part L Domestic Heating Compliance Guide This OSO cylinder must be installed by a competent person and be installed in compliance with the...

Страница 2: ...cludes pressure reducing valve line strainer balanced cold water take off for shower or bidet only check and expansion valve Tundish 3 4 x 22mm Elbow Drain Cock Motorised valve Expansion vessel 1 4 Co...

Страница 3: ...Control Thermostat 80345 10 Cold Feed Tube Not supplied see Table 1 11 Hot Water Outlet 3 4 BSP 12 Elbow Drain Cock 250445 13 Discharge Pipe Not supplied 14 Motorised Valve Not Factory Fitted 15 Expan...

Страница 4: ...6 above 3 1 8 Connect 15mm copper tube from the expansion relief valve 4 and also from the T P valve 5 and join together in a Tee as shown on page 3 3 1 9 Fit the tundish 6 to the bottom connection of...

Страница 5: ...ture and pressure relief valve An internal 18 mm hose can be applied to lead the water to a gully sink or similar 5 2 System flushing This will not be necessary under normal circumstances as the line...

Страница 6: ...cylinder thermostat set at 60 C in line with current government guidelines Lowering the temperature will substantially reduce the amount of usable hot water available on a daily basis and could resul...

Страница 7: ...follow upper diagram Wiring for Standard Heat Pump Thermistor controlled Heat Pumps Many popular Heat Pumps now use a thermistor principle A thermistor temperature sensor is supplied with the Heat Pu...

Страница 8: ...e of cylinder 1 2 E 2 3 1 T6360B 3 3 1 4 G O B1 Br G Y N L E N L E N L ST6400 Heat pump Pump 1 2 3 3 2 3 2 2 2 3 1 V4043H Room thermostat Zone Valve DHW supplied Isolated Mains Supply From Fused Spur...

Страница 9: ...harge from the tundish occurs when water is being heated In this situation maintenance must be carried out by competent person and the precharge pressure must be restored to the original value An annu...

Страница 10: ...tions to motorised valve see 3 6 on page 5 and wiring diagrams on page7 and 8 Intermittent water discharge 1 Reduced expansion vessel charge 1 Follow instruction page 9 Intermittent or slow water disc...

Страница 11: ......

Страница 12: ...lve 6 0 Bar 214005 Part no PRE355030 355030 550853 REDC355030 250445 71242 92000 80345 80314 AX18 AX24 Description Expansion Relief Cartridge Expansion relief valve 8 bar Multibloc Temperature pressur...

Страница 13: ...Regulations 3 Failure to install and commission this appliance to the manufacturer s instructions may invalidate the guarantee The above does not affect your statutory rights For full details on the H...

Страница 14: ...rdance with European Council Directive 98 83 EC or revised version at the date of installation and is not fed with water from a private supply Particular Chloride content Max 250 mg l Sulphate content...

Страница 15: ...ISCHARGE TESTED IS PRIMARY ENERGY SOURCE CUT OUT FITTED NORMALLY 2 PORT VALVE WHAT IS THE PRESSURE REDUCING VALVE SETTING IF FITTED WHERE IS OPERATING PRESSURE REDUCING VALVE SITUATED NO YES NO YES NO...

Страница 16: ...ENTS SIGNATURE DATE ENGINEER NAME SERVICE 5 COMPANY NAME TEL No COMMENTS SIGNATURE DATE ENGINEER NAME SERVICE 7 COMPANY NAME TEL No COMMENTS SIGNATURE DATE ENGINEER NAME SERVICE 9 COMPANY NAME TEL No...

Отзывы: