![Oshkosh JLG X1000AJ Скачать руководство пользователя страница 59](http://html1.mh-extra.com/html/oshkosh/jlg-x1000aj/jlg-x1000aj_service-and-maintenance-manual_1655724059.webp)
SECTION 4 - BOOM & PLATFORM
4-6
3121784
23.
Tighten the adjuster slides. Gap must be no
larger than 0.04 in (1 mm) in every boom section.
Boom sections must be centered on longitudinal
axis.
24.
Install new cotter pins.
25.
Verify microswitch clearance on back side. Mis-
croswitch should be just touching rope balancer
cam.
26.
Tighten screws to secure microswitch.
27.
Install cover and secure with screws.
Back side microwsitch replacement
1.
Unscrew screws and remove microswitch.
2.
Turn screw counter-clockwise to unlock contact
from microswitch.
6.
Pull the bottom of microswith (wire side) to dis-
conect it.
ML00510
ML00380
ML00510
ML00340
ML00350
ML00360
Go
to
Discount-Equipment.com
to
order
your
parts