SECTION 3 - CHASSIS & TURNTABLE
3-70
– JLG Lift –
3120740
14.
Pipe plugs (20) are to be installed into cover (6) using a
lubricant of some sort.
15.
Torque shoulder bolts (13) to 23-27 ft. lbs. and regular
grade 8 bolts (12) to 23-27 ft. lbs.
This completes the assembly. The unit must be filled one-half
full of EP 90 lubricant before operation if the unit is mounted
horizontally, and completely filled if mounted vertically. In ver-
tical mounting application case oil circulation is recom-
mended.
Hub Shaft Sub-Assembly
1.
Press bearing cone (1D) onto shaft (1A).
2.
Press bearing cup (1C) into hub (1G) taking care to
insure cup start square with the bore of the hub.
3.
Invert hub (1G) and press bearing cup (1E) into inter
counterbore of hub (1G).
4.
Returning the hub (1G) to locate on the large diameter
end, the output shaft (1A) is carefully installed into the
hub (1G).