SECTION 3 - CHASSIS & TURNTABLE
3-64
– JLG Lift –
3120740
Apply just enough heat to remove screw, do not over heat the
motor housing or mounting flange.
6.
Remove the mounting flange from the motor housing.
The exclusion seal, pressure seal, and back - up ring will
come off with the mounting flange.
7.
Carefully remove the exclusion seal, pressure seal, and
back - up ring from the mounting flange. A seal removal
tool may be fabricated by bending and rounding the
end of a small blade screwdriver.
DO NOT DAMAGE THE MOUNTING FLANGE WHERE THE SHAFT PASSES
THROUGH IT.
Reassembly
Check all mating surfaces. Replace any parts with scratches or
burrs that could cause leakage. Wash all metal parts in clean
solvent. Blow them dry with pressurized air. Do not wipe parts
dry with paper towels or cloth. Lint in a hydraulic system will
cause damage. Check the key way and chamfered area of the
output shaft; remove any nicks, burrs, or sharp edges that
could damage the shaft seal during assembly.
NOTE:
Always use new seals when reassembling hydraulic
motors.
DURING REASSEMBLY LUBRICATE THE NEW SEALS WITH A PETROLEUM JELLY
LIKE VASELINE. ALSO LUBRICATE MACHINED SURFACES AND BEARINGS WITH
CLEAN HYDRAULIC FLUID.
1.
Remove all of the old Loctite from the mounting flange
cap screws and their threaded holes. The threads must
be clean and dry for the new Loctite to hold properly.
2.
Lubricate and install the output shaft, needle thrust
bearing, and bearing race into the housing.
DO NOT PERMIT OIL TO GET INTO THE FOUR THREADED HOLES.
3.
Lubricate the exclusion seal and press it into its seat in
the mounting flange.
4.
Lubricate and install the back - up ring and pressure. Use
a seal installation tool to press the pressure seal into
place.
Go to
Discount-Equipment.com
to
order your
parts