SECTION 6 - ACCESSORIES
31215054
6-19
6.8
BOLT-ON EXTERNAL FALL ARREST
The bolt-on external fall arrest system is designed to provide a lan
-
yard attach point while allowing the operator to access areas outside
the platform. Exit/Enter the platform through the gate area only. The
system is designed for use by one person.
Personnel must use fall protection at all times. A full body harness is
required with lanyard not to exceed 6 ft. (1.8 M) in length, that limits
the maximum arrest force to 900 lb (408 kg).
External Fall Arrest System capacity is 310 lb (140 kg) - one (1) person
maximum.
Do not move platform during use of the external fall arrest system.
DO NOT OPERATE ANY MACHINE FUNCTIONS WHILE OUTSIDE OF PLATFORM. BE
CAREFUL WHEN ENTERING/EXITING THE PLATFORM AT ELEVATION.
IF THE EXTERNAL FALL ARREST SYSTEM IS USED TO ARREST A FALL OR IS OTHERWISE
DAMAGED, THE ENTIRE SYSTEM MUST BE REPLACED AND THE PLATFORM FULLY
INSPECTED BEFORE RETURNING TO SERVICE. REFER TO THE SERVICE MANUAL FOR
REMOVAL AND INSTALLATION PROCEDURES.
THE EXTERNAL FALL ARREST SYSTEM REQUIRES AN ANNUAL INSPECTION AND CERTI
-
FICATION. THE ANNUAL INSPECTION AND CERTIFICATION MUST BE PERFORMED BY A
QUALIFIED PERSON OTHER THAN THE USER.
Inspection Before Use
The external fall arrest system must be inspected before each use of
the machine. Replace components if there are any signs of wear or
damage.
Содержание JLG 1200SJP
Страница 10: ...iv 31215054 TABLE OF CONTENTS...
Страница 12: ...vi 31215054 LIST OF TABLES...
Страница 14: ...viii 31215054 LIST OF FIGURES...
Страница 33: ...SECTION 2 USER RESPONSIBILITIES MACHINE PREPARATION AND INSPECTION 31215054 2 7 Walk Around Inspection...
Страница 62: ...SECTION 3 MACHINE CONTROLS AND INDICATORS 3 24 31215054...
Страница 94: ...SECTION 4 MACHINE OPERATION 4 32 31215054 4 107 6 9 3 3 O AC 02821 Figure 4 11 Decal Location Sheet 4 of 6...
Страница 103: ...SECTION 4 MACHINE OPERATION 31215054 4 41 4 107 11 9 3 3 O AC 02822 Figure 4 17 Decal Location CE Only Sheet 4 of 6...
Страница 110: ...SECTION 5 EMERGENCY PROCEDURES 5 4 31215054...
Страница 132: ...SECTION 6 ACCESSORIES 6 22 31215054...
Страница 164: ...SECTION 7 GENERAL SPECIFICATIONS OPERATOR MAINTENANCE 7 32 31215054...
Страница 166: ...SECTION 8 INSPECTION AND REPAIR LOG 8 2 31215054 Table 8 1 Inspection and Repair Log Date Comments...
Страница 167: ......