Ormazabal velatia ekor.bat-200 Скачать руководство пользователя страница 17

IG-258-EN, version 02; 16/11/2018

17

General Instructions

ekor

.bat-200

Equipment test 

7.  Equipment test

7.1.  Force states

Via the web, the unit can force states, switching from one 
state to another in order to check operation. The forced 
options are as follows:

• 

Floating.

 Switching to floating state is forced, whenever 

there are batteries connected.  

• 

Fast charge.

 Switching to fast charge state is forced, 

whenever there are batteries connected.

• 

Slow test.

 The start of a slow test or measurement of the 

discharged capacity is forced.

• 

Fast test.

 The start of a fast test or internal impedance 

measurement is forced. 

• 

Soft reset.

 Pressing this button resets the state machine at 

software level. In other words, all the alarms are removed, 
and all the meters and the state machine restart, always 
maintaining voltage without any interruption in supply. 
 
 

7.2.  Hardware test

This window can be used to force the state of the luminous 
indications and the digital outputs during a specific time 
interval in order to test the indication LEDs, the alarms and 
the connections between digital outputs and other units.

The test configuration options are described below:

•  The 

“Start Hardware Test”

 box enables the tests 

process. Test time is limited.

• 

“Maximum duration of test”.

 The maximum time 

forced variables lasts is configured.

• 

LEDs.

 The LED associated with the front of the unit can 

be enabled or disabled by clicking the box next to each 
LED indication. 

• 

“Relay”. 

The charger's digital outputs can be opened 

or closed by clicking the box next to each relay. 
This action means the proper operation of the 
charger's digital outputs can be checked remotely. 
 
 

Содержание velatia ekor.bat-200

Страница 1: ...LIB ekor bat 200 Battery Charger General Instructions IG 258 EN version 02 16 11 2018...

Страница 2: ...ectrical installations Personnel must be fully familiar with the instructions and warnings contained in this manual and in other recommendations of a more general nature which are applicable to the si...

Страница 3: ...t or Impedance measurement 6 2 Characteristics 7 2 1 Electrical characteristics 7 2 2 Dielectric strength 7 2 3 Service conditions 8 2 4 CE Conformity 8 3 Tests 9 3 1 ekor bat 200 battery charger 9 4...

Страница 4: ...ut as shown in the image below 1 Input 2 Output 3 10 kV insulation 4 Phase 5 Neutral 6 AC 7 DC 8 24 48 Vdc 9 0 V 10 Earth 11 Chassis 12 Control 13 Alarms 14 Local signalling 15 Ethernet RS232 Figure 1...

Страница 5: ...ge to vary by each degree centigrade The compensation range is limited between a maximum and minimum temperature comp_tmin and comp_tmax Temperature compensation hab_comp can also be enabled in fast c...

Страница 6: ...ted and no more battery tests are carried out until this alarm is recognised The Battery failure alarm is grouped within the Urgent failure digital output 1 3 5 Fast test or Impedance measurement Thef...

Страница 7: ...nt 20 A Power factor 0 6 Rated power 200 W Maximum power 500 W Output range 48 Vcc 39 60 24 Vcc 18 30 V Table 2 1 Input characteristics The charger has four potential free contacts Parameter Remarks V...

Страница 8: ...requirements RoHS Directive 2002 95 CE Table 2 3 Service conditions For higher altitudes check with Ormazabal for the possible influence on equipment performance 2 4 CE Conformity This product compli...

Страница 9: ...terminals of each unit differential mode 1 kV EN 60255 5 Immunity Level Standard Electrostatic discharge Direct contact mode in metal equipment frames and connectors Level 4 8 kV EN 6100 4 2 Air mode...

Страница 10: ...nt peaks start up at rated power Level to be applied 12 A Mechanical tests Level Standard IP Protection grade Level to be applied IP20 EN 20324 IK Protection grade Level to be applied IK06 EN 50102 Vi...

Страница 11: ...230 Vac rms 2 AC input N phase X2 Alarms 1 Urgent failure alarm NC contact 2 Standalone end alarm NA Contact 3 Power failure alarm NA Contact 4 Non urgent failure alarm NA Contact 5 Alarms common X3...

Страница 12: ...d On Battery test failure end of battery s working life Red Charger ERROR Flashing Anomalies in charger Temperature sensor others On Temperature sensor failure Table 4 2 Description of the indications...

Страница 13: ...button is pressed for more than 3 seconds If there is a battery connected the charge process continues and the battery test failure alarm resets if it is enabled If there is no battery the urgent alar...

Страница 14: ...ETH1 port Access to the charger s webpage is via the ETH1 port both locally and remotely LOCAL IP 100 0 0 1 Remote IP Customised with the requested value Firefox browser version 26 is recommended for...

Страница 15: ...ltage in fast charge V V comp_carga Temperature compensation in fast charge mV C hab_comp Enables temperature compensation in charge 0 NO 1 YES i_flot Battery through current to float mA tlim_carga Ma...

Страница 16: ...esses IP Connexion IP for the SNTP protocol 20 char Gateway Gateway for the SNTP protocol SI_TFALL Time without synchronising in order to consider the internal clock out of sync min T_PETSINCRO Server...

Страница 17: ...oved and all the meters and the state machine restart always maintaining voltage without any interruption in supply 7 2 Hardware test This window can be used to force the state of the luminous indicat...

Страница 18: ...ery alarm is enabled meaning the urgent failure output and the Battery ERROR LED will be enabled 4 Position new batteries and make connections between them 5 Check that battery voltage is between 42 V...

Страница 19: ......

Страница 20: ...Subject to change without prior notice For further information contact Ormazabal Ormazabal Protection Automation IGORRE Spain www ormazabal com...

Отзывы: