Ormazabal velatia ekor.bat-200 Скачать руководство пользователя страница 13

IG-258-EN, version 02; 16/11/2018

13

General Instructions

ekor

.bat-200

Connections 

4.4.  Front button (B1)

The 

ekor

.bat-200 charger has a button for the following 

actions.

•  In total disconnection state. In other words, with charger 

off, without alternating voltage input and batteries 
connected. If the button is pressed for 5 seconds, the 
unit starts up from batteries, provided battery voltage 
has an admissible value greater than the minimum 
parameterised.

•  With the unit running at constant voltage or floating, 

the system carries out a battery reconnection in order 
to check they are connected whenever the button is 
pressed for more than 3 seconds. If there is a battery 
connected, the charge process continues and the 
battery test failure alarm resets if it is enabled. If there 
is no battery, the urgent alarm due to non-connected 
battery is enabled.

4.5.  Earthing

When installing the equipment, it must be checked that it 
is duly earthed. It must be ensured that the charger's two 
earth points are duly connected.

Firstly, there is a check by initiation to ensure that earthing 
has been carried out correctly in the terminal block. See 
section 4.1 for the position of the earth terminal in the 
terminal blocks.

It is then confirmed that the earth connection for the chassis 
has been carried out correctly. The image below shows the 
location of the earth connection.

Figure 4.2. 

Earthing connection in the chassis

Содержание velatia ekor.bat-200

Страница 1: ...LIB ekor bat 200 Battery Charger General Instructions IG 258 EN version 02 16 11 2018...

Страница 2: ...ectrical installations Personnel must be fully familiar with the instructions and warnings contained in this manual and in other recommendations of a more general nature which are applicable to the si...

Страница 3: ...t or Impedance measurement 6 2 Characteristics 7 2 1 Electrical characteristics 7 2 2 Dielectric strength 7 2 3 Service conditions 8 2 4 CE Conformity 8 3 Tests 9 3 1 ekor bat 200 battery charger 9 4...

Страница 4: ...ut as shown in the image below 1 Input 2 Output 3 10 kV insulation 4 Phase 5 Neutral 6 AC 7 DC 8 24 48 Vdc 9 0 V 10 Earth 11 Chassis 12 Control 13 Alarms 14 Local signalling 15 Ethernet RS232 Figure 1...

Страница 5: ...ge to vary by each degree centigrade The compensation range is limited between a maximum and minimum temperature comp_tmin and comp_tmax Temperature compensation hab_comp can also be enabled in fast c...

Страница 6: ...ted and no more battery tests are carried out until this alarm is recognised The Battery failure alarm is grouped within the Urgent failure digital output 1 3 5 Fast test or Impedance measurement Thef...

Страница 7: ...nt 20 A Power factor 0 6 Rated power 200 W Maximum power 500 W Output range 48 Vcc 39 60 24 Vcc 18 30 V Table 2 1 Input characteristics The charger has four potential free contacts Parameter Remarks V...

Страница 8: ...requirements RoHS Directive 2002 95 CE Table 2 3 Service conditions For higher altitudes check with Ormazabal for the possible influence on equipment performance 2 4 CE Conformity This product compli...

Страница 9: ...terminals of each unit differential mode 1 kV EN 60255 5 Immunity Level Standard Electrostatic discharge Direct contact mode in metal equipment frames and connectors Level 4 8 kV EN 6100 4 2 Air mode...

Страница 10: ...nt peaks start up at rated power Level to be applied 12 A Mechanical tests Level Standard IP Protection grade Level to be applied IP20 EN 20324 IK Protection grade Level to be applied IK06 EN 50102 Vi...

Страница 11: ...230 Vac rms 2 AC input N phase X2 Alarms 1 Urgent failure alarm NC contact 2 Standalone end alarm NA Contact 3 Power failure alarm NA Contact 4 Non urgent failure alarm NA Contact 5 Alarms common X3...

Страница 12: ...d On Battery test failure end of battery s working life Red Charger ERROR Flashing Anomalies in charger Temperature sensor others On Temperature sensor failure Table 4 2 Description of the indications...

Страница 13: ...button is pressed for more than 3 seconds If there is a battery connected the charge process continues and the battery test failure alarm resets if it is enabled If there is no battery the urgent alar...

Страница 14: ...ETH1 port Access to the charger s webpage is via the ETH1 port both locally and remotely LOCAL IP 100 0 0 1 Remote IP Customised with the requested value Firefox browser version 26 is recommended for...

Страница 15: ...ltage in fast charge V V comp_carga Temperature compensation in fast charge mV C hab_comp Enables temperature compensation in charge 0 NO 1 YES i_flot Battery through current to float mA tlim_carga Ma...

Страница 16: ...esses IP Connexion IP for the SNTP protocol 20 char Gateway Gateway for the SNTP protocol SI_TFALL Time without synchronising in order to consider the internal clock out of sync min T_PETSINCRO Server...

Страница 17: ...oved and all the meters and the state machine restart always maintaining voltage without any interruption in supply 7 2 Hardware test This window can be used to force the state of the luminous indicat...

Страница 18: ...ery alarm is enabled meaning the urgent failure output and the Battery ERROR LED will be enabled 4 Position new batteries and make connections between them 5 Check that battery voltage is between 42 V...