IG-183-EN version 06; 31/03/2020
48
Recommended sequence of operations
General instructions
cgm
.3 system: medium voltage SF
6
gas-insulated
cubicles up to 38 kV according to IEEE and CSA standards
5.5.2. Closing operation from the open position
1.
Move the actuation shaft access handle in the grey
zone to its lower position.
2.
Insert the lever in the switch-disconnector actuation
shaft and turn clockwise.
3.
Remove the lever, the handle returns to its original
position.
4.
Verify that the cubicle is in closed position.
Figure 5.11.
Closing operation from open position in
cgm
.3-s-ptd