background image

16

Pic.2  Ekoster 2 – back panel view.

 ATTENTION!    

It is necessary to unplug controller when pump wires connection or fuse replacement.

Содержание ORLIGNO 200

Страница 1: ...ORLIGNO 200 INSTRUCTION MANUAL SERVICE MANUAL...

Страница 2: ...2 4 3 2 Main functions of EKOSTER 2 4 4 Gasification process 7 5 Boiler start up 8 5 1 Lightning up 8 5 2 Fuel stoking 8 5 3 Boiler turning off 9 5 4 Optimal boiler s temperature 9 5 5 Power outage a...

Страница 3: ...N Using fuel different than the recommended is treated as wrong boiler operation and resultant performance irregularities cannot be reason for complaint ATTENTION Boiler is equipped with controller th...

Страница 4: ...ns maintaining set temperature of boiler by controlling air blow smooth start up of a blower setting the blower power service mode programmable boiler blow through automatic control switch off after b...

Страница 5: ...ms about temperature increase above 99 C below 9 C or boiler sensor damage To secure the boiler till sensor replacement pump will be automatically activated COMFORT SYSTEM COMFORT SYSTEM function in c...

Страница 6: ...enables to change current parameter value and button is for moving on to next parameter Parameter order HI temperature s hysteresis setting range 2 9 C how much temperature must fall from set tempera...

Страница 7: ...oper gasification process amount and quality of flame will be inadequate Essential factor influencing right gasification process is quality moisture content and type of burned wood The best is hardwoo...

Страница 8: ...to consideration loading chamber depth while stoking the boiler Wood dimensions larger than recommended may cause troubles during closing the upper door It is necessary to avoid closing upper door wit...

Страница 9: ...to the boiler is high enough not to drastically lower temperature in gasification chamber in this way gasification process proceeds correctly Temperature s difference 15 20 C does not strain boiler b...

Страница 10: ...to clean loading chamber Ash needs to be removed through the nozzle Use the tools supplied with the boiler Pitch is created during gasification process Amount of created pitch depends on wood type hu...

Страница 11: ...r must be greased at least once a month with oil or graphite grease To adjust boiler door one should a Remove the door b Loosen screw c Rotate both hinges 360 d Screw up the nut ATTENTION Door adjustm...

Страница 12: ...1 4 Chimney connection 14 2 Technical data 15 2 1 EKOSTER 2 technical data 15 2 2 EKOSTER 2 installation recommendations 15 2 3 EKOSTER 2 electric scheme 17 2 4 Boiler dimensions 18 2 5 Technical data...

Страница 13: ...ch the product is sold may replace above mentioned norms In case of boiler assembly outside Poland rules and norms should be followed according to solid fuel boiler assembly in countries in which the...

Страница 14: ...le cannot have any devices that reduce its section Outlet hole should be placed close to the ceiling led out 1 5 m above the roof Ventilating duct should be made of non inflammable material 2 Height o...

Страница 15: ...15 Electric protection 2 x 1 25 A fusible 2 Technical data 2 1 EKOSTER 2 technical data 2 2 EKOSTER 2 installation recommendations 1 Controller is adjusted to cooperate with solid fuel boilers 2 Cont...

Страница 16: ...16 Pic 2 Ekoster 2 back panel view ATTENTION It is necessary to unplug controller when pump wires connection or fuse replacement...

Страница 17: ...17 2 3 EKOSTER 2 electric scheme...

Страница 18: ...Flue height E mm 960 960 1210 1160 1170 Casing width G mm 600 600 600 740 740 Overall lenght H mm 1060 1060 1040 1360 1720 Hot water outlet I mm 320 320 310 580 610 Flue diameter J mm 200 200 200 210...

Страница 19: ...15 8 Max working pressure bar 3 Minimal return water temperature C 60 Flow resistance t 20 K t 10 K mbar mbar 1 2 4 0 1 4 4 3 1 6 4 9 1 7 4 9 1 6 4 8 Temperatures setting range C 60 97 Protection leve...

Страница 20: ...iler with four way mixing valve and water heater 3 1 Accumulation The most effective way of utilizing gasification process is boiler installation with accumulation tank Such a installation allows to d...

Страница 21: ...let for heating installation 9 Pressurized vessel 10 h d w mixing valve 11 Coil 12 Solar collector 13 Solar pump 14 Safety group Pic 4 Connection scheme of accumulation tank type NADO with solar colle...

Страница 22: ...Used rope leak Rope replacement or call service after warranty service Damaged door Door replacement Controller doesn t work No voltage in the grid Check electric installation Damaged fuse Fuse replac...

Страница 23: ...96 EC on waste electrical and electronic equipment Symbol placed on the components or attached documents means that appliance is not classified as a household waste Scrapping should take place in spe...

Страница 24: ...EKO VIMAR ORLA SKI Sp z o o 48 385 Otmuch w ul Nyska 17b POLSKA woj opolskie T 48 77 400 55 80 81 400 55 91 F 48 77 439 05 03 400 55 96 E biuro orlanski pl www orlanski pl...

Отзывы: