 ATTENTION! 

Lack of fuel in the boiler is signaled with 

   diode. 

5.3. Boiler turning off.

To turn off the boiler press main switch on the controller or automatically in case of lack of fuel.

5.4. Optimal boiler’s temperature.

Main factor assuring trouble-free boiler operation is to keep right boiler’s temperature. 

Proper wood gasification process is assured when boiler’s temperature is at least 85°C.

During big demand for heat it is possible that return water temperature will decrease. If return 

water temperature will be more than 20°C lower than hot water from the boiler, loading chamber 

may partially be cooled, that leads to drop in gasification efficiency. As a result pitch deposits on 

the sides of boiler in larger amounts. To avoid this issue, boiler installation should have small water 

circulation. This can be achieved through 4 way valve installation (or 3 way valve with accumulation 

tank) on the hot water outlet. Four way valve works on principle of hot water mixing with return 

water from heating installation. Right setting of hot and return water streams flowing through the 

valve, ensures that return water to the boiler is high enough not to drastically lower temperature in 

gasification chamber – in this way gasification process proceeds correctly. Temperature’s difference 

15-20°C does not strain boiler body, consequently prolonging boiler lifespan.

5.5. Power outage and pump failure.

During boiler operation power outage or pump failure may happen. If failure occurs during 

heating season, it is necessary to stop stoking the boiler. It is forbidden to run the boiler with 

opened chimney flap. Boiler operation on full draft results in its uncontrolled work that may lead 

to boiler’s overheating.

In case of boiler installation in forced circulation, power outage causes fan and pump turning off. 

Poor heat collection from heating installation (radiators) may also leads to boiler’s overheating.

W celu uniknięcia problemu przegrzania kotła zalecane jest zainstalowanie dodatkowego 

odbiornika ciepła w postaci podgrzewacza wody użytkowej.

In order to avoid boiler overheating it is recommended to install additional heat collector ex. water 

heater, which ensures minimal power output collection ex. 5kW for boiler 25 kW. Thanks to that 

boiler overheating is avoided.

 

ATTENTION! 

In order to secure boiler and electric installation against sudden rise of voltage in the 

grid, it is recommended to use surge protectors like power strips.

Содержание ORLIGNO 200

Страница 1: ...ORLIGNO 200 INSTRUCTION MANUAL SERVICE MANUAL...

Страница 2: ...2 4 3 2 Main functions of EKOSTER 2 4 4 Gasification process 7 5 Boiler start up 8 5 1 Lightning up 8 5 2 Fuel stoking 8 5 3 Boiler turning off 9 5 4 Optimal boiler s temperature 9 5 5 Power outage a...

Страница 3: ...N Using fuel different than the recommended is treated as wrong boiler operation and resultant performance irregularities cannot be reason for complaint ATTENTION Boiler is equipped with controller th...

Страница 4: ...ns maintaining set temperature of boiler by controlling air blow smooth start up of a blower setting the blower power service mode programmable boiler blow through automatic control switch off after b...

Страница 5: ...ms about temperature increase above 99 C below 9 C or boiler sensor damage To secure the boiler till sensor replacement pump will be automatically activated COMFORT SYSTEM COMFORT SYSTEM function in c...

Страница 6: ...enables to change current parameter value and button is for moving on to next parameter Parameter order HI temperature s hysteresis setting range 2 9 C how much temperature must fall from set tempera...

Страница 7: ...oper gasification process amount and quality of flame will be inadequate Essential factor influencing right gasification process is quality moisture content and type of burned wood The best is hardwoo...

Страница 8: ...to consideration loading chamber depth while stoking the boiler Wood dimensions larger than recommended may cause troubles during closing the upper door It is necessary to avoid closing upper door wit...

Страница 9: ...to the boiler is high enough not to drastically lower temperature in gasification chamber in this way gasification process proceeds correctly Temperature s difference 15 20 C does not strain boiler b...

Страница 10: ...to clean loading chamber Ash needs to be removed through the nozzle Use the tools supplied with the boiler Pitch is created during gasification process Amount of created pitch depends on wood type hu...

Страница 11: ...r must be greased at least once a month with oil or graphite grease To adjust boiler door one should a Remove the door b Loosen screw c Rotate both hinges 360 d Screw up the nut ATTENTION Door adjustm...

Страница 12: ...1 4 Chimney connection 14 2 Technical data 15 2 1 EKOSTER 2 technical data 15 2 2 EKOSTER 2 installation recommendations 15 2 3 EKOSTER 2 electric scheme 17 2 4 Boiler dimensions 18 2 5 Technical data...

Страница 13: ...ch the product is sold may replace above mentioned norms In case of boiler assembly outside Poland rules and norms should be followed according to solid fuel boiler assembly in countries in which the...

Страница 14: ...le cannot have any devices that reduce its section Outlet hole should be placed close to the ceiling led out 1 5 m above the roof Ventilating duct should be made of non inflammable material 2 Height o...

Страница 15: ...15 Electric protection 2 x 1 25 A fusible 2 Technical data 2 1 EKOSTER 2 technical data 2 2 EKOSTER 2 installation recommendations 1 Controller is adjusted to cooperate with solid fuel boilers 2 Cont...

Страница 16: ...16 Pic 2 Ekoster 2 back panel view ATTENTION It is necessary to unplug controller when pump wires connection or fuse replacement...

Страница 17: ...17 2 3 EKOSTER 2 electric scheme...

Страница 18: ...Flue height E mm 960 960 1210 1160 1170 Casing width G mm 600 600 600 740 740 Overall lenght H mm 1060 1060 1040 1360 1720 Hot water outlet I mm 320 320 310 580 610 Flue diameter J mm 200 200 200 210...

Страница 19: ...15 8 Max working pressure bar 3 Minimal return water temperature C 60 Flow resistance t 20 K t 10 K mbar mbar 1 2 4 0 1 4 4 3 1 6 4 9 1 7 4 9 1 6 4 8 Temperatures setting range C 60 97 Protection leve...

Страница 20: ...iler with four way mixing valve and water heater 3 1 Accumulation The most effective way of utilizing gasification process is boiler installation with accumulation tank Such a installation allows to d...

Страница 21: ...let for heating installation 9 Pressurized vessel 10 h d w mixing valve 11 Coil 12 Solar collector 13 Solar pump 14 Safety group Pic 4 Connection scheme of accumulation tank type NADO with solar colle...

Страница 22: ...Used rope leak Rope replacement or call service after warranty service Damaged door Door replacement Controller doesn t work No voltage in the grid Check electric installation Damaged fuse Fuse replac...

Страница 23: ...96 EC on waste electrical and electronic equipment Symbol placed on the components or attached documents means that appliance is not classified as a household waste Scrapping should take place in spe...

Страница 24: ...EKO VIMAR ORLA SKI Sp z o o 48 385 Otmuch w ul Nyska 17b POLSKA woj opolskie T 48 77 400 55 80 81 400 55 91 F 48 77 439 05 03 400 55 96 E biuro orlanski pl www orlanski pl...

Отзывы: