8 Maintenance
Operating instructions RA 41 Plus (H)
30
(07.08)
MT_RA 41 Plus (H)_BA_04_790046773_04.doc
orbitalum tools
gmbh
8 Maintenance
The Pipe Cutting and Beveling Machine RA 41 Plus (H) is designed for a long
service life and low maintenance.
Please follow the maintenance instructions below.
Danger of death by electric shock!
X
Pull the mains plug before carrying out any maintenance work and allow
the machine to run a stop.
Interval Activity
Before starting work.
X
Remove any chips and dirt from the saw blades.
X
Keep vent holes free from chips.
Every week.
X
Remove the saw blade and use the brush to clean off any chips.
X
Oil the 4 points marked with arrows.
X
Check the oil level in the gear through the oil level viewglass and top up
with gear oil if necessary (see "Topping up gear oil").
After the first 150 operat-
ing hours (after 3 months
at the latest), then every
1000 operating hours
(every year).
X
Check the oil level in the gear through the oil level viewglass and top up
with gear oil if necessary (see "Topping up gear oil", section 8.2, p. 32).
DANGER
Содержание RA 41 Plus
Страница 39: ......