Install the Cable Management Arm (Optional)
b.
Gently tug on the right side of the front slide bar to verify that connector B is
properly seated.
Callout
Description
1
Connector B tab
2
Right slide-rail front slot
8.
To install CMA connector C into the right slide-rail:
58
Oracle Servers X7-2 and X7-2L Installation Guide • October 2017
Содержание X7-2
Страница 1: ...Oracle Servers X7 2 and X7 2L Installation Guide Part No E72440 03 October 2017 ...
Страница 2: ......
Страница 10: ...10 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Страница 24: ...24 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Страница 34: ...34 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Страница 38: ...38 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Страница 70: ...70 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Страница 82: ...82 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Страница 118: ...118 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Страница 124: ...124 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...
Страница 144: ...144 Oracle Servers X7 2 and X7 2L Installation Guide October 2017 ...