E1000 with Fail-to-Wire Expansion Card:
Port 9 Port 10 Port 11 Port 12
Port 9:
Gigabit Ethernet (Bypass pair with Port 10)
Port 10:
Gigabit Ethernet (Bypass pair with Port 9)
Port 11:
Gigabit Ethernet (Bypass pair with Port 12)
Port 12:
Gigabit Ethernet (Bypass pair with Port 11)
Note:
Ports 9 and 10 may be configured in either Bypass Mode on an E1000 with Fail-to-Wire expansion card, as may ports 11 and 12.
Easy 1
st
Install Site Deployment Criteria:
NCN
:
Easy 1
st
Install can be used once the Network Control Node (NCN) has been set up for your network. If the E1000 being
deployed is intended to become the NCN, please see the instructions for manual installation.
Active Appliance Package: The NCN must be running an active configuration which includes the E1000 for the site
being installed.
Client Site Connectivity
:
Internet, DHCP, and DNS connectivity to the management interface are required to use Easy 1
st
Install. If one or more are not
available, please see the instructions for manual installation. If the management interface is connected to the LAN segment,
communication with the public Internet will be blocked and Easy 1
st
Install will fail.
Cable the LAN and WAN ports in accordance with the Talari configuration for the site.
Use NCN to Upload Client Package to Registration Server:
11. Log in to the Web Console of the NCN.
12. Navigate to
Manage Network > Appliance Installation.
Version 1.1
1 7
Содержание Talari E1000
Страница 24: ...Version 1 1 2 3 ...