2 5
Oracle Talari E100 Hardware Guide
Deploying the E50 APN Appliance
Easy 1st Install
Site Deployment Criteria:
NCN
:
Easy 1
st
Install can be used once the Network Control Node (NCN) has been set
up for your network.
Active Appliance Package: The NCN must be running an active configuration
which includes the E50 for the site being installed.
Client Site Connectivity
:
Internet, DHCP, and DNS connectivity to the management interface are required
to use Easy 1
st
Install. If one or more are not available, please see the
instructions for manual installation.
Cable the LAN and WAN ports in accordance with the Talari configuration for the
site.
Use NCN to Upload Client Package to Registration Server:
1. Log in to the Web Console of the NCN.
2. Navigate to
Manage Network > Appliance Installation.
3. Locate the Site name of the E50 being deployed.
4. Click the Edit pencil
to open the Set Serial Number window.
5. Enter the serial number of the E50 being deployed and click the Set Serial
Number button. (Refer to Page 4 for assistance locating the serial number.)
6. Observe the
Upload/Activate
column. Click the
Upload/Activate
text when it
appears.
7. Continue to observe the
Upload/Activate
column. Once the text reads
Upload
Complete
, proceed to the next section.
Deploy the Talari Appliance:
8. Ensure that the appliance management interface is cabled for Internet
connectivity.
9. Connect the power cord to the E50. Connect the other end to an
appropriately grounded power source. The E50 will power on automatically.
10. The E50 will begin the Easy 1
st
Install process. Please allow up to ten minutes for
the process to complete. (From the NCN Web Console, observe the
Manage
Network > Appliance Installation
page for status updates during installation.)
11. Once the Easy 1
st
Install process has completed, the Talari service will
automatically be enabled.
Содержание Talari E100
Страница 1: ...Oracle Talari E100 Hardware Guide Publication Date August 2020...
Страница 38: ...3 8...