Appendix A
Requirements Checklist
49
TABLE A-5
Environmental Requirements
Requirement
YES
NO
Not
Complete
1
1. Describe incomplete items in
33.
Does the environment where the Netra ft 1800 system will reside meet the
Sun Microsystems specifications for temperature, humidity, and
elevation? See “Environment” on page 7.
NOTE: Please refer to Chapter 2, ”Environmental and Airflow Considerations” for more specific details on what is
required.
34.
Can the environmental specifications where the Netra ft 1800 system will
reside be satisfactorily maintained?
TABLE A-6
Network Requirements
Requirement
YES
NO
Not
Complete
1
1. Describe incomplete items in
35.
Are two dedicated telephone lines for remote access via modem installed
in the proper location?
36.
Will a voice telephone line be installed near the system so that a
craftsperson or technician will be able to work with the system while
speaking on the telephone?
37.
Have all networking cables been ordered to arrive prior to installation?
38.
Have all network connections for each configured network controller been
ordered to arrive prior to installation?
39.
Have all four IP addresses been assigned?
Содержание Sun Netra FT 1800
Страница 6: ...vi Netra ft 1800 Site Planning Guide February 2000 ...
Страница 16: ...6 Netra ft 1800 Site Planning Guide February 2000 ...
Страница 24: ...14 Netra ft 1800 Site Planning Guide February 2000 ...
Страница 36: ...26 Netra ft 1800 Site Planning Guide February 2000 ...
Страница 42: ...32 Netra ft 1800 Site Planning Guide February 2000 ...
Страница 48: ...38 Netra ft 1800 Site Planning Guide February 2000 ...
Страница 52: ...42 Netra ft 1800 Site Planning Guide February 2000 ...
Страница 64: ...54 Netra ft 1800 Site Planning Guide February 2000 ...