Appendix A
Requirements Checklist
47
TABLE A-3
System Requirements
Requirement
YES
NO
Not
Complete
1
1. Describe incomplete items in
18.
Has the system configuration been reviewed, including third-party
hardware and software
19.
Have all the required external connections been identified?
20.
Will the customer make external use of the remote control processor
(RCP)?
21.
Will the alarm reset alarm port be utilized?
22.
Does the customer understand that Sun Microsystems isn’t responsible for
the support of the third party hardware or software?
NOTE: Sun is responsible for assisting in isolating the source of any problem to determine if the problem is with Sun
supplied system componentsor with any third party components. If the problem is determined to be caused by third
party components, Sun must work with the third party vendor to solve the problem expeditiously. If this is a Sun
Integration project, Sun is responsible for supporting all third party components integrated into the Netra ft 1800.
Содержание Sun Netra FT 1800
Страница 6: ...vi Netra ft 1800 Site Planning Guide February 2000 ...
Страница 16: ...6 Netra ft 1800 Site Planning Guide February 2000 ...
Страница 24: ...14 Netra ft 1800 Site Planning Guide February 2000 ...
Страница 36: ...26 Netra ft 1800 Site Planning Guide February 2000 ...
Страница 42: ...32 Netra ft 1800 Site Planning Guide February 2000 ...
Страница 48: ...38 Netra ft 1800 Site Planning Guide February 2000 ...
Страница 52: ...42 Netra ft 1800 Site Planning Guide February 2000 ...
Страница 64: ...54 Netra ft 1800 Site Planning Guide February 2000 ...