![Oracle SPARC T7-2 Скачать руководство пользователя страница 54](http://html1.mh-extra.com/html/oracle/sparc-t7-2/sparc-t7-2_installation-manual_1646142054.webp)
Connect a Terminal or Emulator to the SER MGT Port
Note -
Oracle ILOM will signal a fault if both power supplies are not cabled at the same time,
since it will be a nonredundant condition. Do not be concerned with this fault in this situation.
Route the power cords from the AC power source to the rear of the server.
Do not attach the power cords to the power supplies at this time.
Related Information
■
“Rear Panel Components (Installation)” on page 13
■
“Powering On the Server for the First Time” on page 53
Connect a Terminal or Emulator to the SER MGT Port
Prior to powering on the server for the first time, make a serial connection to the SP. After
making this serial connection, you will be able to view the system messages when you connect
the power cords.
1.
Confirm that you have completed the following tasks:
a.
Completed the preparation for installation.
See
“Preparing for Installation” on page 19
.
b.
Completed the installation of the server in a rack.
See
“Installing the Server” on page 23
c.
Connected the necessary cables.
See
“Connecting the Server Cables” on page 41
2.
Connect a terminal or a terminal emulator (PC or workstation) to the server SER
MGT port.
3.
Configure a terminal or terminal emulator with these settings:
■
9600 baud
■
8 bits
■
No parity
■
1 Stop bit
54
SPARC T7-2 Server Installation Guide • March 2016
Содержание SPARC T7-2
Страница 1: ...SPARC T7 2 Server Installation Guide Part No E54986 03 March 2016 ...
Страница 2: ......
Страница 8: ...8 SPARC T7 2 Server Installation Guide March 2016 ...
Страница 14: ...14 SPARC T7 2 Server Installation Guide March 2016 ...
Страница 40: ...40 SPARC T7 2 Server Installation Guide March 2016 ...
Страница 74: ...74 SPARC T7 2 Server Installation Guide March 2016 ...