Preparing to Install or Service Equipment
These topics describe how to prepare to install or service equipment in the rack.
■
“Equipment Installation Task Overview” on page 41
■
“Insert Cage Nuts Into Rail Holes” on page 43
■
“Install a Cable Management Hook” on page 44
■
“Service Equipment in the Rack” on page 45
■
“Extend the Anti-tilt Bar” on page 47
■
“Attach an Antistatic Wrist Strap” on page 48
■
“Power Off the Rack” on page 49
Related Information
■
■
■
“Preparing for Rack Installation” on page 23
■
“Installing the Rack” on page 31
■
■
“Returning the Rack to Operation” on page 51
■
“Servicing the Rack” on page 55
Equipment Installation Task Overview
Follow these general steps when installing equipment into the rack.
Step Description
Links
1.
Follow all safety guidelines for the rack and the equipment.
“Equipment Installation Task Overview” on page 41
Preparing to Install or Service Equipment
41
Содержание 1242
Страница 1: ...Oracle Rack Cabinet 1242 User s Guide Part No E87280 03 July 2018 ...
Страница 2: ......
Страница 8: ...8 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Страница 10: ...10 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Страница 14: ...14 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Страница 30: ...30 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Страница 54: ...Power On the Rack Retract the Anti tilt Bar on page 52 54 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Страница 84: ...84 Oracle Rack Cabinet 1242 User s Guide July 2018 ...