Service Equipment in the Rack
3.
Place the cable management hook so that its mounting plate aligns with any two
adjacent threaded holes on the inside of the rail.
4.
Use the screws to secure the cable management hook to the rail.
5.
Route data cables from the installed equipment through the installed cable
management hooks.
Note -
Refer to the equipment documentation for additional cable routing instructions or
guidelines.
Related Information
■
“Prepare Factory-Installed PDUs” on page 37
■
“Insert Cage Nuts Into Rail Holes” on page 43
Service Equipment in the Rack
These steps provide general instructions for servicing equipment in the rack. Always refer to the
equipment documentation for specific instructions.
Preparing to Install or Service Equipment
45
Содержание 1242
Страница 1: ...Oracle Rack Cabinet 1242 User s Guide Part No E87280 03 July 2018 ...
Страница 2: ......
Страница 8: ...8 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Страница 10: ...10 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Страница 14: ...14 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Страница 30: ...30 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Страница 54: ...Power On the Rack Retract the Anti tilt Bar on page 52 54 Oracle Rack Cabinet 1242 User s Guide July 2018 ...
Страница 84: ...84 Oracle Rack Cabinet 1242 User s Guide July 2018 ...