4.2 COMMISSIONING
The last step in the installation process is commissioning the meter. Commissioning is a 2 step
process. The first step is to review the mechanical installation to confirm that the flow meter is
properly located in the piping system. The second step is a review of the meter program settings.
Both steps must be completed in order to finish the installation. A simple commissioning
checklist is shown below. A copy of this may be found online at www.onicon.com/F-4600.html.
Commissioning Checklist
Part 1 Mechanical installation
Confirm that the flow sensor is properly located in the piping system (Sec. 3.1 & 3.2).
Confirm that the flow sensor is properly oriented with respect to flow direction (Sec. 3.2).
Part 2 Programming
Verify that the Units of Measure Settings in the meter are correct (Sec. 4.1).
Confirm that there are no alarm indications and the meter is functional (Sec. 4.1.2).
4.2.1 Commissioning Following Initial Power-up
During initial power-up, the following display pages will appear when the commissioning
option is selected. The settings shown on the following page allow the installer to set
MODBUS
®
or BACnet
®
parameters, and the date and time. If the factory pre-programmed
engineering units for flow and temperature are correct, press SAVE to exit commissioning
once the correct date has been set. Momentarily press NEXT if you wish access the
remaining commissioning mode display pages as shown.