background image

O.A.S. 2008

c

5 - 7.5 HP Direct Drive Owner’s Manual

9

VII.  Fan / Blower Maintenance

A high pressure blower requires a certain amount of resistance which will prevent motor

over amperage.
Make sure power source matches wire voltage configurations.
Check set screw and key in fan wheel, make sure fan wheel is secure. Fan blower should

not vibrate.

1. Electrical -

 Failure to follow instructions and safe electrical procedures could result in serious injury or death.

Disconnect all power and discharge all capacitors before servicing. Install and ground per local and national

codes. Consult a licensed electrician with questions or if repairs are required.

   Electrical Connections -

A.) All wiring, fusing, and grounding must comply with National Electrical Codes and local codes.

B.) To determine proper rotation and voltage connections, refer to the Wire Diagram of this manual.

C.) Use the proper size of line current protection and motor controls as required by the National Electrical Code

and local codes. Recommended use is 125% of full load amps as shown on the nameplate for motors with

40 degrees Celsius ambient and a service factor over 1.0. Recommended use is 115% of full load amps as

shown on the nameplate for all other motors. Do not use protection with larger capacities than recommended.

Three phase motors must have all three phases protected.

2. Cleanliness - 

Keep both the interior and exterior of the motor free from dirt, water, oil, and grease.

3. Safety - 

Motors should be installed, protected and fused in accordance with latest issue of National Electrical

Code, NEMA Standard Publication No. MG 2 and local codes. Rotating parts such as pulleys, coupling, external

fans, and unusual shaft extensions should be permanently guarded. Keep hands and clothing away from

moving parts. Electrical repairs should be made by trained, qualified personnel only.

4. Service - Notice - 

If lubrication instructions are shown on the motor nameplate, they will supercede this

general instruction.

Warning: Rotating Fan Blades. Keep Objects Clear of Inlet and Outlet.

82” for single

55 gal. drum

or 106” for

twin drums.

30 3/8”

Mount to wall using apprpriate

hardware and methods for your

situation.

Position Cone on Brackets

making sure that gasket material

is in position.
Making sure that cyclone barrel

and fan / blower housing is

correctly oriented for your set-

up, position corresponding bolt

holes over cone holes and

fasten with supplied hardware.

Be very careful with this part of

procedure. Unit is very top

heavy. Make sure you have

appropriate help.

Wall Bracket Mounting Instructions

Содержание XXK050100

Страница 1: ...5 7 5 HP Direct Drive Cyclonic Dust Collectors Oneida Air Systems Inc 1001 West Fayette St Syracuse N Y 13204 Phone 1 800 732 4065 315 476 5151 Fax 315 476 5044 www oneida air com Owner s Manual 10_08...

Страница 2: ...l before installing or operating system I II III IV V VI VII VIII IX X XI XII XIII XIV XV XVI 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 20 System Start Up Information Direct Drive Configurations Gene...

Страница 3: ...troyed motors due to improper wiring or incorrect installation Caution The Dust Collector Fan Blower is heavy Handling and installation should always be performed by experienced and trained personnel...

Страница 4: ...water gauge whichever comes first Never allow gauge to reach 5 XXK050100 1 phase XXK070300 3 phase 9a 0 1 2 3 4 5 INCHES W C 8a 8b 8c 8e 8d 7 5 hp Direct Drive System XXK070300 3 phase 1 Motor Blower...

Страница 5: ...tion Class F4 Voltage 208 230 460 Amperage 19 6 18 4 9 2 Made in U S A Integral Fan Blower 7 5hp 2 Pleated Cartridges 260 sq ft Spun Bonded polyester BIA ZH1 487 test Rated C Captures 99 99 of test ma...

Страница 6: ...IV Dimensions O A S 2008 c 5 7 5 HP Direct Drive Owner s Manual 5 10 031 I D 7 64 I D 1 25 Flange 52 25 82 or 106 for Twin Drum 60 134 25 or 158 25 33 Approx 100 33 56 105 or 129 122 or 146...

Страница 7: ...nt B Back Requires Fork Truck for installation 1 Bolt stand together laying down Orient square cross brace 7 Cross brace 6 must be oriented to face plenum Note There will be NO lower brace on front so...

Страница 8: ...sher on bolt then attach hex nut Tip the fan housing and cone upright The system is very top heavy Cyclone Inlet and Fan Blower are independent Filters can be to the right or left of the unit 7 Bolt F...

Страница 9: ...nnector is air tight or motor damage could result Stay clear of fan exhaust while collector is operating Collector Hose Clamp Hose Clamp Flex Hose Dust Bin 6 7 Attach the ductwork from the woodworking...

Страница 10: ...shown on the nameplate for all other motors Do not use protection with larger capacities than recommended Three phase motors must have all three phases protected 2 Cleanliness Keep both the interior...

Страница 11: ...nclip and carefully empty dust bin All steps should be done with a dust mask and eye protection and System off 1 Compressed air from outside Blast air along pleats of the filter at about a 20 angle Bl...

Страница 12: ...ound Connect house ground wire to green chassis screw in motor wire housing box Motor Wire Box Green Chassis Screw Top View Outlet Inlet 1 Blue 8 Red J Brown 5 Black Power Line 1 Tie together and insu...

Страница 13: ...g across the Line Starters Nema Type 1 Enclosure with Start Stop in cover and class 10 overload Industrial switches can also be purchased through your local electrician Due to varying electrical codes...

Страница 14: ...pe too small a hood port or too small a branch line See branch line diameter chart in ductwork guide Be sure that your filters are clean See filter cleaning directions Filters filling with large chips...

Страница 15: ...low 420 microns in size 017 of an inch in certain concentration ranges when ignited can deflagrate burn quickly An ignition source such as a spark or ember can ignite a dust mixture resulting in an ex...

Страница 16: ...idental contingent special or consequential damages arising from the use of our product Oneida Air Systems does not warrant or authorize use of wood dust collectors for other purposes This includes wo...

Страница 17: ...e to the port labeled on the back of the pressure gauge 5 Make sure the tubing is not crushed or kinked along its entire length cut shorter if necessary 4 When the gauge rises to 3 it s time to clean...

Страница 18: ...3600 RPM motors are to be relubricated every 5500 hours Table 1 Service Conditions Table 2 Lubrication Interval Multiplier Per Baldor specifications add 30 ounces 8 4 grams of Mobil Polyrex grease by...

Страница 19: ...per must be installed by a licensed electrician The jumper is not required if you are using 3 phase power Remove the blank plate and install the start stop pushbutton into the starter cover You must m...

Страница 20: ...ntrol circuit Most OAS Starters are shipped with 240v coils Plug the Start Stop Push Button Assembly into keyed receptacle As shown below Run power to the starter and from the starter to your motor Se...

Страница 21: ...t Install this Jumper for Single O Using the Same Gauge Wire Sized Connected to L1 L2 Omit this Wire for Single O Move this Wire to L2 for Single O Note Select Size of Fuse or Circuit Breaker Per Arti...

Отзывы: