19
Before Operating
Section 1-7
1-7
Before Operating
Follow the procedure given below to start the system of the NT20S.
Host
NT20S
Support tool
Check and change
the Host settings.
S
For the host link, refer
to page 36 and the
manuals for the host
link unit and peripheral
tools.
S
For the NT link (1:1),
refer to page 47.
S
For the NT link (1:N),
refer to page 49.
S
When using C200H di-
rect communication, no
settings are required.
S
For the RS-232C, refer
to page 63 and the
manuals for the Host.
Connect to the NT20S.
Create the PC program.
Set the DIP switches.
(page 24)
Install to the operation
panel.
(page 28)
Connect the power
supply.
(page 29)
Connect to the Host.
S
(Host link: page 32)
S
(NT link (1:1) : page 45)
S
(NT link (1:N) : page 49)
S
(C200H direct commu-
nication: page 58)
S
(RS-232C: page 63)
Check the settings and
communications.
Transfer the
screen data.
(page 86)
Install support tools
to the computer.
(refer to Section 4 and the
manuals for the support tools)
Create the screens.
Start operation.
Reference: As far as possible, use NT series support tool Ver.2.
j
as the support tool. For
details on the support tools that can be used, see Appendix F “Function Restric-
tions Depending on the Support Tool” (page 255).
Содержание NT20S
Страница 1: ...Cat No V020 E1 04 NT20S Programmable Terminal OPERATION MANUAL ...
Страница 2: ...i ...
Страница 3: ...ii ...
Страница 4: ...iii NT series Programmable Terminal Operation Manual Revised August 1997 ...
Страница 5: ...iv ...
Страница 7: ...vi ...
Страница 11: ...x ...
Страница 19: ...xviii ...
Страница 129: ...110 ...
Страница 169: ...150 ...
Страница 253: ...234 ...