2 Installation and connection
2-1 Installation
BN50T/BN75T/BN100T/BN150T/BN220T/BN300T
2-2
Incorrect Positions
2 Installation and connection
2-2 Connecting the equipment
BN50T/BN75T/BN100T/BN150T/BN220T/BN300T
2
2-3
2-2 Connecting the equipment
Caution
(for connection)
Do not connect devices, rated voltage is not 100V AC.
The rated output voltage of this device is 100 VAC.
Overcurrent may damage the connected devices.
2-2-1 Connecting a device to the power supply output
For cautions when connecting the UPS, refer to “Caution (for installation and connection)”
shown in the “Safety precautions” of the beginning of this manual.
Control by group of “power supply output” (BN100T/BN150T/BN220T/BN300T only)
The output receptacles of the UPS (BN-T) are separated into 3 groups: A,
B, and C.
The output start times for power supply output group B and C are independent of
power supply output group A, so they can be delayed or set to precede the output
stop time.
The output start/stop time control function is available with the setting on the LCD
panel or when using the “PowerAct Pro” UPS monitoring software (included soft-
ware) or “SNMP/Web card” (sold separately).
Output ON/OFF can be controlled by operating the LCD panel or with the included
“PowerAct Pro” UPS monitoring software while the UPS is operating.
The delay settings and ON/OFF control described here can be performed inde-
pendently for power supply output group B and power supply output group C.
This function can be used to set the startup order of servers, peripheral devices, etc.
The output receptacles can also be forcibly turned ON/OFF remotely.
Power supply output group A
Power supply output group B
Power supply output group C
Output ON
Output OFF
Time setting
Time setting
Time setting
Time setting
1
. Disconnect the AC Input Plugs of all devices you want to back up such as your PC and
modems from a wall outlet (commercial power source).
PC
Wall outlet
(commercial power source)
Computer peripheral devices
Содержание BN100T
Страница 2: ......
Страница 24: ...1 Preparation BN50T BN75T BN100T BN150T BN220T BN300T 1 8...
Страница 26: ...2 Installation and connection 2 1 Installation BN50T BN75T BN100T BN150T BN220T BN300T 2 2 Incorrect Positions...
Страница 36: ...2 Installation and connection BN50T BN75T BN100T BN150T BN220T BN300T 2 12...
Страница 54: ...3 Check and start operation BN50T BN75T BN100T BN150T BN220T BN300T 3 18...
Страница 72: ...4 Maintenance and Inspection BN50T BN75T BN100T BN150T BN220T BN300T 4 18...
Страница 88: ...6 Using the contact signal functions BN50T BN75T BN100T BN150T BN220T BN300T 6 8...
Страница 94: ...8 Troubleshooting BN50T BN75T BN100T BN150T BN220T BN300T 8 4...
Страница 95: ...9 Note of Chinese BN50T BN75T BN100T BN150T BN220T BN300T 9 9 1 9 Note of Chinese UPS UPS 1 UPS FA OA Windows...
Страница 96: ...9 Note of Chinese BN50T BN75T BN100T BN150T BN220T BN300T 9 2 2 FA OA 2 AC 50 60Hz AC AC...
Страница 97: ...9 Note of Chinese BN50T BN75T BN100T BN150T BN220T BN300T 9 9 3 AC AC 3P 2P AC AC 5cm UPS UPS...
Страница 99: ...9 Note of Chinese BN50T BN75T BN100T BN150T BN220T BN300T 9 9 5 1mA AC UPS AC UPS...
Страница 100: ...9 Note of Chinese BN50T BN75T BN100T BN150T BN220T BN300T 9 6 AC AC 50 60Hz 25 25 6 40 2 AC AC DC250V UPS...
Страница 105: ...10 References 10 2 Dimensions BN50T BN75T BN100T BN150T BN220T BN300T 10 3 10 BN220T BN300T 22 200 403 403...
Страница 109: ...Cut here...