P12
MASONRY INSTALLATION
Good
No Good
Utilisez le gabarit mural pour marquer les emplacements de montage
Use la guía de la pared para marcar el lugar donde se realizará la instalación
Use wall template to mark mounting locations
EN
ES
FR
Follow directions on the mounting template and use Bubble Level (W-D),
secure to wall.
Locate the middle mark of the Wall Template.
STEP 1
STEP 2
For solid concrete wall installation 6 screws and anchors are required.
STEP 3
2
2
W-D
2