3-6
Drawers
Removal Procedure
OmniTT/AnesthesiaTT Installation and Service Guide/67-2024 Rev D
© 2010 Omnicell, Inc.
11. Connect a slide to the left side of the carrier using the three screws provided. Tighten the
screws using a Torx T15 screwdriver.
Figure 3-6.
Install the new slide support bracket
12. Replace the drawer on the rails. Be sure to place the drawer controller cable between the two
ends of the drawer controller cable clamp.
13. Secure the pharmacy drawer controller
and the drawer controller cable to the
pharmacy drawer with the two screws provided. Use a Torx T10 screwdriver.
14. Close the drawer and replace the pharmacy manual override cover.
15. Power up the cabinet.
16. Program the drawer at the OmniSupplier in OmniConfigurations.
Removal Procedure
1. Perform a graceful shutdown of the CT PC box.
2. Remove the
Figure 3-7.
Remove the manual override cover
Содержание OmniTT
Страница 1: ...OmniTT AnesthesiaTT Installation and Service Guide 67 2024 Rev D...
Страница 41: ......