SECTION 3. GENERATOR PROBE & ACCESSORY MAINTENANCE
3.4 BEARING RUN-IN
If the BEARING was replaced, it must be run-in before use.
1. Immerse 1/3 of the GENERATOR in water and run the MOTOR at a
low speed for one minute.
2. Increase speed at one minute intervals for three minutes
3. Run at full speed for one minute.
4. Disconnect the unit from the power source
NOTE:
If the probe is excessively noisy, turn the motor off and return to
step 1.
5. Remove the GENERATOR TUBE and clean the BEARING with the
brush. (DO NOT remove the bearing or collet nut)
6. Re-install the GENERATOR TUBE. The Tissue Master is now ready for
use.
9
Содержание TISSUE MASTER 125
Страница 1: ...OMNI TISSUE MASTER USER MANUAL REV B ...
Страница 14: ...NOTES 14 ...
Страница 15: ...NOTES 15 ...