Correct cable and connection 

 

The installation cable must be suitable for data transfer. 

 

We recommend:    - LiYCY   -  YSLY-OZ 

 

The communication cables must be placed 40cm away from any MAINS cable. 

 

The communication cables must be placed 5m away from any motors or power station. 

 

The cross section depends on the distance and the number of installed points. The 
communication cable must contain 2 conductors, a shield and no additional unused conductors. 

 

 

Select shielded cable for every installation. 

 

The cable shield must be reconnected in every cut during the length of the loop and must be 

terminated to the «PE»

 (Power Earth). 

 

The positive and negative polarity must be maintained throughout the installation.   

 

All points must be connected in parallel with the output. 

 

 

 

 

+L
-L

N
L

+L
-L

N
L

+L
-L

N
L

Luminaire 1

.

Luminaire .2

Luminaire 3

.

ADR communication
line

power 
supply

                Length of 

                     cable 

Luminaires 

200m 

500m 

1000m 

1500m 

2000m 

50 

0.75 mm

2

 

1  mm

2

 

1 mm

2

 

1.5 mm

2

 

2.5 mm

2

 

100 

1 mm

2

 

1 mm

2

 

1.5 mm

2

 

1.5 mm

2

 

2.5 mm

2

 

150 

1.5 mm

2

 

1.5 mm

2

 

2.5 mm

2

 

2.5 mm

2

 

2.5 mm

2

 

Содержание GR-6500

Страница 1: ...1 923650001_90_004 Emergency lighting addressable panel GR 6500 Quick Installation Guide Generic Design LIGHTING ADR...

Страница 2: ...h the corresponding Olympia Electronics addressable luminaires NEEDED MATERIALS Mounting Hardware Screwdrivers Multi meter Pliers Cutter MAINTENANCE The periodical checks must follow the EN50172 or be...

Страница 3: ...500 can support up to 250 points The maximum connected points to each LOOP must not exceed the 150 Each point must have unique non repeatable address No arithmetic address sequence is obligatory Keep...

Страница 4: ...and no additional unused conductors Select shielded cable for every installation The cable shield must be reconnected in every cut during the length of the loop and must be terminated to the PE Power...

Страница 5: ...opology Note Max 250points in total Point 1 Point 2 Point 3 Point 4 Point 5 L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L Z 1A Z 1B Point Point Point Point Point Poin...

Страница 6: ...st Connect the each zone to the corresponding output of the panel Connect the monitoring Relays Optional Connect the 12V 7Ah Lead Acid battery with the correct polarity ACTIVATION Make sure there is n...

Страница 7: ...et through the panel connecting and setting the luminaires one by one ADDRESSING LUMINAIRES TECHNICIAN MENU SETTINGS CHANGE ADDRESS POINT Note It is not required to connect the 230VAC power on the lum...

Страница 8: ...the panel TECHNICIAN MENU POINTS Assign a Zone for each point Optional TECHNICIAN MENU Program FUNCTION TEST TECHNICIAN MENU Program CAPACITY TEST TECHNICIAN MENU NETWORK Set ETHERNET PCB Enable or Di...

Страница 9: ...Verify the specifications of the communication cable THE PANEL REPORTS POINT LAMP BATTERY FAULT As mentioned the error comes from either an unconnected battery or a lamp led error Inspect for probabl...

Страница 10: ...o the address where the problem is By repairing the connection problem on point we can now see only GOOD packets increasing we can see the name of the luminaire as well as the battery voltage and char...

Отзывы: