4
923650001_90_004
Correct cable and connection
•
The installation cable must be suitable for data transfer.
•
We recommend: - LiYCY - YSLY-OZ
•
The communication cables must be placed 40cm away from any MAINS cable.
•
The communication cables must be placed 5m away from any motors or power station.
•
The cross section depends on the distance and the number of installed points. The
communication cable must contain 2 conductors, a shield and no additional unused conductors.
•
Select shielded cable for every installation.
•
The cable shield must be reconnected in every cut during the length of the loop and must be
terminated to the «PE»
(Power Earth).
•
The positive and negative polarity must be maintained throughout the installation.
•
All points must be connected in parallel with the output.
+L
-L
N
L
+L
-L
N
L
+L
-L
N
L
Luminaire 1
.
Luminaire .2
Luminaire 3
.
ADR communication
line
power
supply
Length of
cable
Luminaires
200m
500m
1000m
1500m
2000m
50
0.75 mm
2
1 mm
2
1 mm
2
1.5 mm
2
2.5 mm
2
100
1 mm
2
1 mm
2
1.5 mm
2
1.5 mm
2
2.5 mm
2
150
1.5 mm
2
1.5 mm
2
2.5 mm
2
2.5 mm
2
2.5 mm
2