THE PANEL FINDS 
ONLY CERTAIN 
LUMINAIRES 

 

1)

 

There is an open circuit in the 
communication line. If the 
connection is done using the loop 
topology then there might be 
more than one open circuit.  

2)

 

Another cause might be wrong 
addressing of non detected points. 

Find the open circuit, between the 
last detected point and the first un 
detected. To easily see the 
communication indication go to 

MENU>TEST>POINTS IN TEST

 and by 

using the up/down arrows go to the 
address where the problem is. By 
repairing the connection problem, 
on point 

Χ

 we can now see only 

«

GOOD

» 

packets increasing, we can 

see the 

name of the luminaire

 as 

well as the battery voltage and 
charge or lamp current.  
(any connection open circuit can be 
located in section 5, CABLE 
INSPECTION)  
If there is no open circuit then test 
for wrong addressing. 

THE PANEL REPORTS: 

«

POINT  

Χ

, CONFLICT 

DATA

»

 

 

The panel detects more that one 
points with the same address. 

Inspect the adjusted addresses for 
errors. The point that can

t be 

recognized in the desired address via 
the operation  

MENU>TEST>POINTS IN TEST

 as 

mentioned above probably has a 
conflicting address with another 
point. 

 

Содержание GR-6500

Страница 1: ...1 923650001_90_004 Emergency lighting addressable panel GR 6500 Quick Installation Guide Generic Design LIGHTING ADR...

Страница 2: ...h the corresponding Olympia Electronics addressable luminaires NEEDED MATERIALS Mounting Hardware Screwdrivers Multi meter Pliers Cutter MAINTENANCE The periodical checks must follow the EN50172 or be...

Страница 3: ...500 can support up to 250 points The maximum connected points to each LOOP must not exceed the 150 Each point must have unique non repeatable address No arithmetic address sequence is obligatory Keep...

Страница 4: ...and no additional unused conductors Select shielded cable for every installation The cable shield must be reconnected in every cut during the length of the loop and must be terminated to the PE Power...

Страница 5: ...opology Note Max 250points in total Point 1 Point 2 Point 3 Point 4 Point 5 L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L Z 1A Z 1B Point Point Point Point Point Poin...

Страница 6: ...st Connect the each zone to the corresponding output of the panel Connect the monitoring Relays Optional Connect the 12V 7Ah Lead Acid battery with the correct polarity ACTIVATION Make sure there is n...

Страница 7: ...et through the panel connecting and setting the luminaires one by one ADDRESSING LUMINAIRES TECHNICIAN MENU SETTINGS CHANGE ADDRESS POINT Note It is not required to connect the 230VAC power on the lum...

Страница 8: ...the panel TECHNICIAN MENU POINTS Assign a Zone for each point Optional TECHNICIAN MENU Program FUNCTION TEST TECHNICIAN MENU Program CAPACITY TEST TECHNICIAN MENU NETWORK Set ETHERNET PCB Enable or Di...

Страница 9: ...Verify the specifications of the communication cable THE PANEL REPORTS POINT LAMP BATTERY FAULT As mentioned the error comes from either an unconnected battery or a lamp led error Inspect for probabl...

Страница 10: ...o the address where the problem is By repairing the connection problem on point we can now see only GOOD packets increasing we can see the name of the luminaire as well as the battery voltage and char...

Отзывы: