background image

923650001_90_004 

 

MOUNTING THE PANEL 

 

The panel must be installed in a suitable area and must not be obscured. Also it must be 
powered by a permanent 230V power connection from the fuse panel and not via a power 
outlet or a wall switch. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PREREQUISITE REQUIREMENTS AND PRELIMINARY PROCEDURES 

Addressable Luminaire Connections 

 

16 available Zones. 

 

The GR-6500 can support up to 250 points. 

 

The maximum connected points to each LOOP must not exceed the 150. 

 

Each point must have unique non repeatable address.  

 

No arithmetic address sequence is obligatory. 

 

Keep a record of points

 addresses and names. 

 

 

 

Mo u n t in g H o le s

Ba t t e r y co mp a r t me n t 

A- 9 8 6 ( 1 2 V/ 7 Ah Pb )

BMS r e la y

Ge n e r a l o u t p u t s

( Sir e n s, o p t ica l in d ica t o r s - 2 4 V/ 0 . 3 A ma ximu m

)

F u se d t e r min a l b lo ck ( 2 2 0 - 2 4 0 V AC )

F u se T

V

  0 . 6 3 Α/ 2 5 0

Mo u n t in g h o le

C o mmu n ica t io n o u t p u t s

Z 1 A, Z 1 B, Z 1 C , Z 1 D

Min i U SB

Содержание GR-6500

Страница 1: ...1 923650001_90_004 Emergency lighting addressable panel GR 6500 Quick Installation Guide Generic Design LIGHTING ADR...

Страница 2: ...h the corresponding Olympia Electronics addressable luminaires NEEDED MATERIALS Mounting Hardware Screwdrivers Multi meter Pliers Cutter MAINTENANCE The periodical checks must follow the EN50172 or be...

Страница 3: ...500 can support up to 250 points The maximum connected points to each LOOP must not exceed the 150 Each point must have unique non repeatable address No arithmetic address sequence is obligatory Keep...

Страница 4: ...and no additional unused conductors Select shielded cable for every installation The cable shield must be reconnected in every cut during the length of the loop and must be terminated to the PE Power...

Страница 5: ...opology Note Max 250points in total Point 1 Point 2 Point 3 Point 4 Point 5 L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L L Z 1A Z 1B Point Point Point Point Point Poin...

Страница 6: ...st Connect the each zone to the corresponding output of the panel Connect the monitoring Relays Optional Connect the 12V 7Ah Lead Acid battery with the correct polarity ACTIVATION Make sure there is n...

Страница 7: ...et through the panel connecting and setting the luminaires one by one ADDRESSING LUMINAIRES TECHNICIAN MENU SETTINGS CHANGE ADDRESS POINT Note It is not required to connect the 230VAC power on the lum...

Страница 8: ...the panel TECHNICIAN MENU POINTS Assign a Zone for each point Optional TECHNICIAN MENU Program FUNCTION TEST TECHNICIAN MENU Program CAPACITY TEST TECHNICIAN MENU NETWORK Set ETHERNET PCB Enable or Di...

Страница 9: ...Verify the specifications of the communication cable THE PANEL REPORTS POINT LAMP BATTERY FAULT As mentioned the error comes from either an unconnected battery or a lamp led error Inspect for probabl...

Страница 10: ...o the address where the problem is By repairing the connection problem on point we can now see only GOOD packets increasing we can see the name of the luminaire as well as the battery voltage and char...

Отзывы: