![Olymp LavaSit SPLENDOR Edition Скачать руководство пользователя страница 10](http://html2.mh-extra.com/html/olymp/lavasit-splendor-edition/lavasit-splendor-edition_mounting-instructions_5148364010.webp)
Splendor Edition / Shiatsu MO W+R page
2
of
3
12. Place the shampoo station exactly over the floor
dowels and fasten to the floor with 4 hexagonal wood
screws Ø 8x50.
ATTENTION:
if the floor is uneven, underlay the
fastening points accordingly until the shampoo
station is absolutely horizontal. Only then tighten the
screws in the floor!
13. Remove the protective film from the trim parts.
14. Mount the wall installation tunnel:
Connection to shampoo station:
(illustr.. 6 - 8)
Mount the connection adapter (2) with the connection
rubber (1) using M5 screws, washers and nuts.
Connection to wall:
(illustr. 9
– 10)
Mount 3 mounting brackets (4) onto the wall.
Shorten the installation tunnel, if necessary. Provide
the wall side by means of edge protection rubber.
Put on the wall installation tunnel.
Insert connecting clamps (5) on the underside of the
tunnel.
15. Only for in-line installation:
(illustr. 6 - 8)
Mount the connection adapter (2) with the connection
rubber (1) using M5 screws, washers and nuts.
Install the connection tunnel.
16. Reassemble the seat/leg rest upholstery: Hook the
locking bracket onto the frame by pushing it over the
crossbar and bracket from behind
(illustr. 5).
Reinsert the back cushion: insert it into the armrest
recess on one side, then press into the armrest
recess on the other side, then press down firmly
(illustr. 4).
Mounting instructions for waterpipe installers:
Make water connection:
17. Remove the inspection cover on the back.
To open, press the chrome-plated button and pull to
release the magnetic connection
(illustr. 2)
18. Remove the installation tunnel
(illustr. 10),
to do this
loosen the connecting clamps (5) on the underside and
remove the installation tunnel (3) upwards.
19. Screw tightly waste water pipe Ø 40 mm and pressure
lines R ½ inch with stopcocks between the wall and the
shampoo station.
Secure the stopcocks against
twisting when screwing in.
Make connection of waste
water hose and odor trap (siphon) using a seal and union
nut. Insert the waste water hose at least 3 - 4 cm into the
odor trap (siphon). Connect the drain socket to the waste
water hose using a hose clamp.
20. Only for in-line installation with installation tunnel:
Remove the installation tunnel
(illustr. 8),
to do this
loosen the connecting clamps (4) on the underside and
remove the installation tunnel (3) upwards.
Lay and connect supply lines and waste water pipe for
the 2nd system.
Put the installation tunnel (3) on and secure it with the
connecting clamps (4) on the underside.
21. Close the mixing tap. Open the stop valve and check for
leaks with the mixing tap closed. Check the mixed water.
The hot water and cold water supply must correspond to
the coloured symbols on the mixing tap.
22. Check the pressure of the unit with 8 bar water pressure.
Then set the pressure to 3 to 5 bar. On completion of the
installation work, always rinse out the water pipes.
A central regulating tap is required if more than one unit
is installed. This tap must be easily accessible from the
salon.
These mounting instructions apply to the connection of
one unit.
If more than one unit is to be installed, the pipe
cross section must be increased accordingly.
Important:
If the water pressure is above 5 bar, it must be
regulated by a pressure reduction valve.
Note for salon owners:
The connections described under points 1 to 2 and 17 to 22
must be performed by the installer. The installer is responsible
for any problems that may occur. The manufacturer of the unit
shall not accept warranty claims for this work.
GB