Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 21
32.
Place completed
Gable Section
so framing sits flush with the inside of the
Top Wall Plate
. It
should also be centered side-to-side on the
Top Wall Plate
. Gable Flashing overhangs wall on the
outside. Temporarily attach
Gables
to
Top Wall Plate
with
4 - 2” screws
. Gables may need slight
adjustment in
Step 45
when attachment will be completed with an additional 6 screws. Screw from
the bottom of
Gable
framing down into
Top Wall Plate
and
Wall Framing
. Complete
Gable
posi-
tioning and attachment on the other side.
Hint:
Use a straight edge to check the angle of the Gable
framing and Top Plate. Both angles should lineup at 22.5°.Attach Gable tip to shed with
2 - 1 1/2”
Finishing Nails
as shown above.
Flashing overhangs
outside of rear wall