background image

Regular Maintenance & Tips to prolong the life of your shed.

Before/During Assembly:

 

 1.) Paint each face and edge of your plywood floor with a latex exterior paint. 
 2.) Caulk wall seams if gaps appear. 
 3.) Caulk around window framing. 
 4.) Caulk perimeter between floor plywood and bottom wall plate. 
 5.) Caulk channels in lap siding at the top of your door above the trim, just a drop in each channel. 
 6.) Caulk edge of door threshold (if applicable). 
 7.) Optional: Install a Sill Gasket between floor runners and foundation. 
 8.) Optional: Install an 8” strip of roofing paper below Cedar Ridge Caps for Cedar Roof Sheds.

Routine Maintenance:

 

 - Routinely check all fasteners are tight (ex. Door Hinges, Nails) 
 - Brush off dirt from walls. 
 - Brush off snow from roof regularly. 
 - Routinely remove needles and leaves from roof.

Painting/Staining

 

 - Your cedar shed, if left untreated, will weather to a silvery grey colour. 
 - Painting or staining your structure is highly recommended and will prolong the life of your shed. 
 - You do not need to wait to paint or stain your shed, the wood in your kit has been dried and can be 

stained or painted immediately. 

 - Consult your local paint store for the best paint or stain for cedar. 
 - Optional: stain the inside of your shed. (Note: this will remove the fresh cedar smell.)

1.

2.

3.

4.

5.

6.

7.

Sill Gasket

Floor Joists

Floor Runner

Foundation

8.

Floor Plywood

Wall Panel

Small gap between 
bevel siding and 
window trim

Dab of caulking

Strip of roofing paper over 
apex of roof panels

  Toll Free 1-888-658-1658              www.outdoorlivingtoday.com        [email protected]

Page 7

Содержание SunShed SSGS1216-AK-Ply

Страница 1: ...roducts Revision 1 4 October 4 2022 Thank you for purchasing a 12x16 SunShed Garden Shed from Outdoor Living Today Please take the time to identify all the parts prior to assembly Safety Points and Ot...

Страница 2: ...e on the type of foundation you will be using Concrete slab or 4 6 inches of crushed gravel with paver stones or 4x4 stringers You can nd the footprint for your shed on Page 3 of your Assembly Manual...

Страница 3: ...of floor frame Saves money on materials easy to level and work with Gravel with Patio Paver Stones Excavate at least 6 deep and 6 wider than floor frame on each side 3 9 Cubic Yards of gravel required...

Страница 4: ...r Spacer 1 45 1 4 long Drip Edge with Bevel Siding attached Top Wall Plates Gables 4 1 1 2 x 2 1 2 x 70 3 4 Front Rear Riser Plates 4 1 1 2 x 2 1 2 x 88 1 2 Side Riser Plates 4 3 4 x 2 1 2 x 45 Front...

Страница 5: ...2 1 2 x 8 Horizontal Door Trim 1 1 2 x 2 1 2 x 32 Horizontal Door Trim 2 3 4 x 4 1 2 x 42 Horizontal Gable Trims Bevel 4 3 4 x 4 1 2 x 45 1 4 Horizontal Gable Trims Bevel 2 9 1 2 x 7 1 2 Pentagon Det...

Страница 6: ...2 2 1 1 4 3 4 2 3 4 Tee Hinge x4 Pull Handle x 1 Ridge Board Connector x 3 Silver Square Drive Bit Hardware Kit Provided Black Drop Latch Silver Barrel Bolt 1 1 2 Finishing 490 pcs 230 pcs 28 pcs 550...

Страница 7: ...s Brush off dirt from walls Brush off snow from roof regularly Routinely remove needles and leaves from roof Painting Staining Your cedar shed if left untreated will weather to a silvery grey colour P...

Страница 8: ...osition 72 Floor Joists in 75 frames and 63 1 2 Floor Joists in 66 1 2 frames Position Joists equally in Floor Joist Frame Position Joist so flush with framing Flush with framing Wide Floor Runners 2...

Страница 9: ...the floor frame 5 1 2 wide Floor Runner should overhang the edge of the floor Frame by 2 3 4 Third set of Floor Runners should be centered on Floor Frame Parts Steps 4 9 Wide Floor Runners 1 1 2 x 5...

Страница 10: ...rews per completed runner length 39 Total For Wide Floor Runner use 4 screws in the 56 pieces and 5 screws in the 70 piece For the 3 1 2 Floor Runner use 5 screws for the 72 pieces and 3 screws for th...

Страница 11: ...ether attach each 75 Frame to 66 1 2 Frame with 3 2 1 2 screws 36 Total Use 2 screws on both sides to attach horizontally On the 66 1 2 Frame side toenail one screw into the Wide Floor Runner 10 Posit...

Страница 12: ...floor is level prior to proceeding to the next step of wall assembly 141 1 2 182 Front of Shed B Wall Section Solid Wall Panels 4 Side Riser Plates 4 Side Top Plates 6 Window Wall Panels 4 Gable Half...

Страница 13: ...rior to screwing This will make it much easier to attached together Pilot Hole Plate first Parts Step 12 Solid Wall Panels 45 1 2 x 81 3 4 x 4 Solid Wall Panel Extra Studs 45 1 2 x 81 3 4 x 1 Bottom W...

Страница 14: ...With Extra Vertical Studs so bottom 2x3 wall framing is sitting flush with outside floor frame Wall siding should overhang floor by approximately 3 4 Attach rear wall panel studs together as per Step...

Страница 15: ...and securing remaining Double Window Walls Attach wall studs together as per Step 14 Important Pilot hole studs first 18 Complete attachment of left side Solid Wall Panels At the front of the shed sid...

Страница 16: ...flush against right wall panel stud The Jamb is 3 1 2 wide and will sit flush to outside of wall siding When posi tioned correctly secure Jamb using 4 2 1 2 screws Part Step 21 Vertical Door Jamb 1 1...

Страница 17: ...s Part Step 23 24 Door Header 1 1 2 x 7 1 4 x 45 1 2 x 1 Door Header Spacer 1 2 x 7 1 4 x 45 1 2 x 2 Hardware Step 23 24 S3 2 Screws x 13 total 24 Place assembled Door Header onto Door Header Riser an...

Страница 18: ...check the level of your floor You may need to make slight adjustments before proceeding Optional Caulking seams will help prevent moisture from entering your shed Caulking is included to complete pol...

Страница 19: ...total 28 Position and attach Side Riser Plates with 6 2 screws per piece Complete both sides of shed Parts Steps 28 SIde Riser Plates 1 1 2 x 2 1 2 x 88 1 2 x 4 Hardware Steps 28 S3 2 Screws x 24 tot...

Страница 20: ...x 45 1 2 x 2 3 4 x 2 1 2 x 65 3 4 x 4 Hardware Steps 30 S2 1 1 4 Screws x 24 total Top and Side plates flush 31 Locate Triangular Gable Half Walls for both sides of shed Align framing and wall siding...

Страница 21: ...bles to Top Wall Plate with 4 2 screws Gables may need slight adjustment in Step 45 when attachment will be completed with an additional 6 screws Screw from the bottom of Gable framing down into Top W...

Страница 22: ...Polygal Side 12 1 1 2 x 3 1 2 x 80 7 8 Rafters 2 3 4 x 9 1 4 x 45 1 2 Ridge Boards 1 3 4 x 9 1 4 x 91 Ridge Board 2 1 2 x 4 1 2 x 68 1 4 Soffits C Rafter Section Ridge Boards 91 3 Ridge Boards 45 1 2...

Страница 23: ...tal S3 2 Screws x 48 total S2 1 1 4 Screws x 48 total 35 Attach completed Ridge Board to ends of both outside Rafters with 2 2 screws per end Measure and position interior Rafters as illustrated above...

Страница 24: ...When positioned correctly attach Soffits to remaining Rafters with 2 1 1 4 screws rafter Important Pilot Hole Soffits to prevent splitting Important Pilot hole Soffit to prevent splitting 37 Complete...

Страница 25: ...rom side to side Where Wall and Soffit meet a small gap may appear Confirm all Rafters are resting on Top Plate Gable Notch Slide bottom of Ridge Board into notch of Gable Slight gap between Wall and...

Страница 26: ...e Ridge Boards meet press together and secure with 16 1 1 4 screws per side We recommend using a clamp to hold the Ridge Boards together flush while screwing Stagger screw position vertically on Ridge...

Страница 27: ...does not line up with Rafters remove temporary 2 screws from Gable framing Re align gable and then secure 46 Start by attaching one Gusset onto the mid dle Rafters as illustrated Attach only 1 2 scre...

Страница 28: ...ached in Step 46 Important Pilot hole ends of Gusset to prevent splitting Hardware Steps 48 Y30 Single Rafter Bracket x 8 total Y31 Double Rafter Bracket x 6 total S2 1 1 4 Screws x 16 total S3 2 Scre...

Страница 29: ...omplete remaining Polygal Support Cleats Parts Step 49 Polygal Support Cleats Short 3 4 x 3 4 x 38 x 4 Polygal Support Cleats Long 3 4 x 3 4 x 48 x 12 Hardware Step 49 S2 1 1 4 Screws x 64 total 1 4 G...

Страница 30: ...ng Center Roof Panels 5 8 x 45 1 2 x 81 1 2 x 2 Hardware Step 50 54 S2 1 1 4 Screws x 36 total Roof Plywood 1 8 from rafter end 51 Position Panel so roof plywood sits evenly on doubled up Rafters Scre...

Страница 31: ...screw panel down with 9 1 1 4 screws 55 Locate Short Right Roof Panel Lift and place panel on polygal side of roof Position Short Right Roof Panel equally on seam of dou bled up Rafter as per Step 51...

Страница 32: ...om each panel Exterior interior side of protective poly gal film is printed on film be sure to note the side and install accordingly Slide panel up between Rafters so it rests on Polygal Support Cleat...

Страница 33: ...port Cleats Polygal is delicate tight en screws a half turn at a time so screws are flush with top of Polygal Panel Use 3 3 4 screws to secure Polygal Panel to underside of Roof Plywood 59 Position an...

Страница 34: ...nstalling trim improves Horizontal Gable Trim Outside 4 Above Door Trim 2 Dutch Door with Hardware 1 Reg Windows 4 Reg Windows Trims 4 Wide Corner Trim 4 Bottom Skirting 14 Side Trims 10 Side Facia Ou...

Страница 35: ...total Rear of Shed Side of Shed 61 Position Narrow Door Trim on left side of door opening and one Door Trim on right side of door Right side will sit flush with Door Jamb Left side will sit flush on e...

Страница 36: ...m recessed slightly Hinges should be centered on door trim with barrel nudged to end of trim Use 2 3 4 screws as above Top Door Bottom Door 2 Screws 3 4 Screws Parts Step 63 Dutch Door Bottom x 1 Shim...

Страница 37: ...er laps Bottom Trim to pre vent water from getting in 1 4 gap on inside Hardware Step 65 SB1 3 4 Black Screws x 16 total Y3 Black Handle x1 Y4 Black Drop Latch x1 Y5 Silver Barrel Bolt x1 65 Attach Do...

Страница 38: ...0 Hardware Step 68 N1 1 1 2 Finishing Nails x 80 total 68 Attach Side Trims to cover side wall seams and in the corners align tight underneath Soffit and even with Filler Trims Attach each with piece...

Страница 39: ...Finishing Nails x 32 total 69 Attach Wide Corner Trims over Filler Trims Wide Trim will cap Side Trims Attach with 8 1 1 2 Finishing Nails per piece Wide Trim Side Trim Parts Step 70 Rear Wall Trims 1...

Страница 40: ...ttached facia nailing strip is below Plywood roof panel When correctly aligned attach Caps to center of outside Rafter with 4 1 1 2 Finishing Nails Use a straight edge to align Cap with Plywood Roof P...

Страница 41: ...de of roof on Non Polygal side flush edge to edge Repeat this step on rear of shed Fasten each cleat with 3 1 1 4 screws per piece Parts Step 75 77 F R Facia angled ends 3 4 x 5 1 2 x 81 1 4 x 4 Hardw...

Страница 42: ...side Secure with 8 1 1 2 Finishing Nails per piece Side Facia will cap Front and Rear Facia 77 Attach remaining Front Rear Facia pieces to Facia Cleats and Outside Ridge Cap edge with 10 1 1 2 Finish...

Страница 43: ...er seam between Window Wall Panel and Narrow Wall Panel Use 8 1 1 2 Finishing Nails Parts Step 80 Horizontal Door Trim 1 2 x 2 1 2 x 8 x 1 1 2 x 2 1 2 x 32 x 1 Hardware Step 80 N1 1 1 2 Finishing Nail...

Страница 44: ...1 2 x 2 Facia Detail Plates 8 x 5 1 2 x 4 Hardware Step 82 N1 1 1 2 Finishing Nails x 36 total 82 Attach Facia Detail Plates and Pentagon Detail Plates to cover seams where Facia and Trim pieces come...

Страница 45: ...tter fit Trim dado sits in flange Page 45 T h i c k b u t t o f s i d i n g Caulk gap Caulk gap Window frame Siding Butt Screw insert into bottom thick part of siding 84 To reduce possible water from...

Страница 46: ...erneath first screw and once again into the wall stud Install Flower Box Kits underneath each window double window Hardware Step 87 S1 2 1 2 Screws x 38 total 87 Locate Long Potting Shelf and 2 Pottin...

Страница 47: ...are and level Attach legs as previously illustrated Screw to wall stud and up into the underside of shelf framing Continue attaching shelves along wall as per Steps 87 88 Short Potting Shelf goes in t...

Страница 48: ...ps 3 On a flat surface flip Flower Box on it s rear face Evenly space Brackets and secure through Base Frame and into the Brackets with 2 1 1 4 screws per Bracket Position completed Flower Box beneath...

Страница 49: ...t such that its use creates a false or misleading statement or impression as to the positions statements or actions Note Our Sheds are shipped as an unfinished product If exposed to the elements the w...

Отзывы: