66.
Locate
3J -
Metal Roof Panels Short
. Place first short roof panel
onto Battens and lineup with same overhang as the long roof panels. Roof
Panels should overlap on sixth Batten with short panels on top. Panel will
overhang door side Batten by approximatley 1”. Do not attach Metal Roof
Panel until all panels are positioned and spaced. In the meantime, have a
helper hold the panel in place so it doesn’t slide off.
Parts (Steps 66 - 69)
3J
- Metal Roof Panels
(Short)
(39”wide x 41” long)
x 4
4AP - Foam Enclosures
(Several Pcs)
Hardware
12 - 1/4” x 2” Metal Screws
Panel overlap on 6th Batten.
67.
Locate and position remaining
3J - Metal roof Panels Short
on Battens as per Step 64.
Space panels so width matches long roof panels.
68.
Once Short Metal Roof Panels are
spaced correctly from side-toside- and top to
bottom, lift panels up and run a bead of caulk-
ing down the overlapping seams of each
panel to seal the joints.
Bead of Caulking
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 33