Front Side
Gable.
Extender
Wall
Gable wall
framing.
Flush
Even
28.
Position
2K - Rear Upper Wall Plates
on rear
extender wall framing, flush with inside of extender
framing and even with outside wall. Attach each piece
with
4 - 2” Screws
.
Parts
2K - Rear Upper Wall Plates
-
11° angle on face
(3/4” x 2 1/2” x 68 1/4”)
x 2
Hardware
(
S3
- 2” Screws
) x 8 total
27.
Position bottom frame of
2I - Front Side Gable Wall
onto side wall top plate. Align so gable wall and
side wall 2x3’s are even. Front gable vertical frame will sandwich against front window wall vertical frame.
When correctly aligned, attach with
6 - 2 1/2” Screws
. Complete other side the same.
26.
From the outside, siding of gable will overlap side wall. When aligned, secure gable with
5 - 2 1/2” Screws
. On a ladder, push extender wall and gable wall together tight and then screw.
2” Screw.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 17